BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: A267529
NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND
Premises: 47-01 5 STREET QUEENS BIN: 4000076     Block: 29   Lot: 28
   

Filed: 47-01 5 ST Census Tract:   7 Health Area:  0720
5 ST Admin Area:   A - QUEENS Inspection Area:   C
QUEENS, NY 11101 Community Board:   402
DOB Cross Street(s):    47 AVENUE,    47 ROAD
Status:   K - CLOSED/CANCELLED 07/18/2008
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  04/16/2008 10:41 AM
Application Entered:   04/16/2008 Job Start Date:   04/16/2008
Last Change:   07/18/2008 Job End Date:   04/16/2008
Appointment Status:   
Last Inspection By:   ERROL FLYNN FRANKLIN       On     07/15/2008      
Field Disp:   K - OK TO CANCEL
Energize Recommendation:  
Objection Disposition:  

License #: 010913 Licensee Name: JOHN MARI, JR.
Firm: 002201 Firm Name: MARI ELEC. CONTR'S INC.
Firm Phone: 718-815-1700  Firm Address: 463 WILD AVE STATEN ISLAND NY 10314 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
9 - OTHER
Total Fee:  $40.00
Other Work:   SIDEWALK BRIDGE
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   SIDEWALK BRIDGE
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: JOE BESADA
Owner Business Name: SPRING SCAFF
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                       
Total Units : 6 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  SIDEWALK BRIDGE LIGHTING

 
Inspection Details
 

*NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND
INSPECTION FOR APPLICATION #: A267529
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/15/2008 07/18/2008 EFF K (15) (0)
INSPECTION COMMENTS: REMOVED BEFORE INSPECTION




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order