![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M237191 | ||
| NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND | ||
| Premises: 15 WAVERLY PLACE MANHATTAN | BIN: 1008839 Block: 548 Lot: 45 |
| Application Completed and Certified | ||
| Filed: | 23 WAVERLY PL | Census Tract: 59 | Health Area: 5700 | |
| APT#2X | Admin Area: M - MANHATTAN | Inspection Area: S | ||
| NEW YORK, NY 10003 | Community Board: 102 | |||
| DOB Cross Street(s): WAVERLY PLACE, EAST 8 STREET | |||
| Status: C - JOB IS SIGNED OFF 09/23/2004 | |||
| Request Type: A - APPLICATION | eFiled: NO | ||
| Application Entered: 08/18/2004 | Job Start Date: 09/01/2004 | ||
| Last Change: 09/23/2004 | Job End Date: 10/01/2004 | ||
| Appointment Status: | |||
| Last Inspection By: MCKENZIE, W. On 09/18/2004 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 010804 | Licensee Name: | SANG CHEUNG | |
| Firm: | 002065 | Firm Name: | AL-LECTRIC ELECT'L CONTRG | |
| Firm Phone: | 212-219-3336 | Firm Address: | 137 CHRYSTIE STREET NEW YORK NY 10002 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $42.25 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: | |||||||
| Owner / Occup: | DONALD MILLER | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | 8 | 2 | 1 | 8 | ||||||||
| Total Units : 19 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: BRANCH WIRING | |||
|
|
| *NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND |
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 09/18/2004 | 09/23/2004 | WMK | C | (40) | (0) | Y | |||
| INSPECTION COMMENTS: | BATHROOM ONLY | |||||||||