Premises: 23 CATON PLACE BROOKLYN BIN: 3124033     Block: 5320   Lot: 24
   

Filed: 23-45 CATON PL Census Tract:   504 Health Area:  5310
RESIDENTIAL - 107 APARTMENTS Admin Area:   B - BROOKLYN Inspection Area:   F
BROOKLYN, NY 11218 Community Board:   307
Special Place Name:   EAST 8TH STREET
Related Job Number:    301880891
DOB Cross Street(s):   OCEAN PARKWAY,    EAST 8 STREET
Status:   K - CLOSED/CANCELLED 11/05/2008
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  07/26/2006 9:39 AM
Application Entered:   07/26/2006 Job Start Date:   07/27/2006
Last Change:   11/05/2008 Job End Date:   07/27/2007
Appointment Status:   
Last Inspection By:   JAMES CLANCY       On     10/28/2008      
Field Disp:   K - OK TO CANCEL
Energize Recommendation:  
Objection Disposition:  

License #: 011437 Licensee Name: ANTONY GIRONTA
Firm: 002894 Firm Name: AGIR ELEC'L LTD. D/B/A
Firm Phone: 718-846-6200  Firm Address: 130-45 91ST AVENUE PINNACLE ELECTRICAL RICHMOND HILL NY 11418 

Work Started or Filed by Others: NO
Work Category:   N - NEW BUILDING Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT
6 - GENERAL WIRING
Total Fee:  $5,040.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   REQUIRED
Advisory Board Categories:      K - 1000 KVA SERVICE                            
Advisory Board Approval #:        Submittal #:   
Owner / Occup: MOSHE FELLER
Owner Business Name: CATON ON THE PARK LLC
Authorized Representative:  MOSHE FELLER
Relationship To Owner:   MANAGER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  5  1-1200A , 4-800A
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  11  11 SETS
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  107  20 CIRC PANELS
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  7  225 PANELS
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  4  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 850  1150  192  1170  1926     175     15      
Total Units : 5478 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 107 #4-Wire 0 #10-Wire 1
Existing Meters 0 + New Meters 108 - Removed Meters 0 = Total Meters 108

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 07/26/2006 Notice:  
Power Issued: 07/26/2006 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

*NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND
INSPECTION FOR APPLICATION #: B281396
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 10/28/2008 11/05/2008 JMZ K (0) (0) Y
INSPECTION COMMENTS: BASED UPON INSPECTION OK TO CANCEL