BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: A355624
NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND
Premises: 109-05 120 STREET QUEENS BIN: 4249509     Block: 11601   Lot: 1
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 109-05 120 ST Census Tract:   166 Health Area:  3220
SWK Admin Area:   A - QUEENS Inspection Area:   L
QUEENS, NY 11420 Community Board:   410
DOB Cross Street(s):    109 AVENUE,    111 AVENUE
Status:   C - JOB IS SIGNED OFF 07/23/2018
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  11/06/2016 7:19 PM
Application Entered:   11/06/2016 Job Start Date:   11/07/2016
Last Change:   07/23/2018 Job End Date:   11/30/2016
Appointment Status:   
Last Inspection By:   RILEY (MONTY) MONTAGUE       On     06/26/2018      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 012637 Licensee Name: SANKAR C SHIL
Firm: 004479 Firm Name: GREEN POWER ELECTRIC CORP
Firm Phone: 718-445-2740  Firm Address: 74-09 37TH AVENUE 2 FLOOR #206 JACKSON HEIGHTS NY 11372 

Work Started or Filed by Others: YES
Work Category:   R - REHABILITATION Work To Be Done:  
W - SIDEWALK SHED WIRING & LIGHTING
Total Fee:  $42.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   C - Three Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: RAGHBIR SINGH
Owner Business Name: TOTAL NY CONSTRUCTION COR
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
SWK    10        10             
Buildings Total 10        10                
Total Units : 20 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALLING SIDEWALK SHED LIGHT 200 L.F

 
Inspection Details
 

*NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND
INSPECTION FOR APPLICATION #: A355624
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/26/2018 06/26/2018 MYT C (20) (0) Y
INSPECTION COMMENTS: JOB CERTIFIED, SCAFFOLD REMOVED




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order