![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M352900 | ||
| NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND | ||
| Premises: 156 EAST 3 STREET MANHATTAN | BIN: 1004966 Block: 398 Lot: 8 |
| Filed: | 160 E 3 ST | Census Tract: 30.02 | Health Area: 6600 | |
| APT 6F | Admin Area: M - MANHATTAN | Inspection Area: T | ||
| NEW YORK, NY 10009 | Community Board: 103 | |||
| DOB Cross Street(s): AVENUE A, AVENUE B | |||
| Status: M - ADMINISTRATIVELY CLOSED (MINOR WORK) 04/23/2014 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 04/23/2014 3:11 PM | |
| Application Entered: 04/23/2014 | Job Start Date: 04/23/2014 | ||
| Last Change: 04/23/2014 | Job End Date: 05/23/2014 | ||
| Appointment Status: | |||
| Last Inspection By: On | |||
| Field Disp: | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011838 | Licensee Name: | VINCENZO NAPOLITANO | |
| Firm: | 003445 | Firm Name: | NAPSTAR ELECTRIC INC | |
| Firm Phone: | 718-384-2939 | Firm Address: | 647 METROPOLITAN AVE BROOKLYN NY 11211 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: M - MINOR WORK | Work To Be Done:
9 - OTHER |
Total Fee: $15.00 | ||||||
| Other Work: REPLACE SWITCHES AND | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: | |||||||
| Owner / Occup: | CARLOS GOMEZ DE LLARENA | ||||||
| Authorized Representative: VINCENZO NAPOLITANO | |||||||
| Relationship To Owner: LICENSED ELECTRICIAN | |||||||
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 006 | 6F | 7 | 3 | |||||||||
| Buildings Total | 7 | 3 | ||||||||||
| Total Units : 10 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | |||
| Contractor's Comments: REPLACING OTLETS AND SWITCHES | |||
|
|
| *NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND |
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |