| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/07/2020 |
104212139 |
02 |
A2 |
P APPROVED |
08/07/2020 |
|
ISLAM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 07/02/2020 |
103645619 |
15 |
A2 |
P APPROVED |
07/02/2020 |
|
ISLAM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL
|
| 07/02/2020 |
103645619 |
14 |
A2 |
P APPROVED |
07/02/2020 |
|
PIMENTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PS 145M- REMOVE 2 FUEL OIL TANKS AND RELATE
|
|
Work on Floor(s): CEL 001 thru 003
|
| 11/25/2019 |
103647190 |
02 |
A2 |
P APPROVED |
11/25/2019 |
|
BAZINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/13/2019 |
103645619 |
13 |
A2 |
P APPROVED |
09/13/2019 |
0025243 RA |
RICARDO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): OSP,CEL
|
| 09/10/2019 |
121276948 |
03 |
A2 |
P APPROVED |
09/13/2019 |
|
FEINBERG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001
|
| 12/14/2018 |
103645619 |
12 |
A2 |
P APPROVED |
12/14/2018 |
|
PIMENTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 003
|
| 10/19/2018 |
104212503 |
04 |
A2 |
P APPROVED |
10/19/2018 |
0021391 RA |
BERGER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001
|
| 10/19/2018 |
104212503 |
03 |
A2 |
P APPROVED |
10/19/2018 |
0081788 PE |
BARADE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 09/27/2018 |
103645619 |
11 |
A2 |
P APPROVED |
09/27/2018 |
|
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): OSP,CEL,001,002,003
|
| 09/27/2018 |
103645619 |
10 |
A2 |
P APPROVED |
09/27/2018 |
|
PIMENTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 003
|
| 09/11/2018 |
123121497 |
02 |
A2 |
P APPROVED |
09/11/2018 |
|
KOKLANOS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/10/2018 |
103645619 |
09 |
A2 |
P APPROVED |
09/10/2018 |
0093237 PE |
PIMENTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 003
|
| 08/30/2018 |
103650568 |
01 |
A3 |
P APPROVED |
02/14/2020 |
0021711 RA |
RAY |
|
NOT APPLICABLE
|
|
M145 FIRE PROTECTION FIELD HEREWITH.
|
|
Work on Floor(s): CEL,001,002,003,ROF
|
| 06/22/2018 |
103645619 |
07 |
A2 |
P APPROVED |
06/22/2018 |
|
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): OSP,CEL,001,002,003
|
| 01/11/2018 |
104213076 |
02 |
A2 |
R PERMIT-ENTIRE |
02/22/2022 |
0021391 RA |
BERGER |
|
NOT APPLICABLE
|
|
PROVIDE A PIPE ENCLOSURE FOR REFRIGERANT LINES INSIDE AND OUTSIDE THE BUIL
|
|
Work on Floor(s): CEL,001
|
| 01/11/2018 |
104213076 |
01 |
A2 |
R PERMIT-ENTIRE |
04/08/2025 |
0081788 PE |
BARADE |
|
NOT APPLICABLE
|
|
PROVIDE SUPPLEMENTAL COOLING BY MEANS OF A SPLIT SYSTEM FOR THE AUDITORIUM
|
|
Work on Floor(s): CEL,001
|
| 08/21/2017 |
123121497 |
01 |
A2 |
X SIGNED OFF |
07/14/2023 |
0090604 PE |
KOKLANOS |
|
NOT APPLICABLE
|
|
FILING FOR THE INSTALLATION OF CONCRETE CURBS, FOOTINGS, RAMP, AND RETAINI
|
|
Work on Floor(s): OSP
|
| 07/03/2017 |
104212503 |
02 |
A2 |
R PERMIT-ENTIRE |
04/26/2022 |
0021391 RA |
BERGER |
|
NOT APPLICABLE
|
|
P.S. 145-M: REMOVE EXISTING STAGE RESILIENT FLOORING AND PROVIDE NEW STAGE
|
|
Work on Floor(s): 001
|
| 07/03/2017 |
104212503 |
01 |
A2 |
R PERMIT-ENTIRE |
04/08/2025 |
0081788 PE |
BARADE |
|
NOT APPLICABLE
|
|
P.S.145-M REMOVE EXISTING STAGE LIGHTING FIXTURES AND PROVIDE NEW STAGE LI
|
|
Work on Floor(s): 001
|
| 06/13/2017 |
121276948 |
02 |
A2 |
X SIGNED OFF |
03/06/2023 |
0083458 PE |
FEINBERG |
|
NOT APPLICABLE
|
|
HEREWITH FILE TO RENOVATE EXISTING MECHANICAL SYSTEMS, PLUMBING FIXTURES A
|
|
Work on Floor(s): 001
|
| 06/12/2017 |
121276948 |
01 |
A2 |
X SIGNED OFF |
03/06/2023 |
0022333 RA |
SAGE |
|
NOT APPLICABLE
|
|
HEREWITH FILE TO RENOVATE EXISTING COMFORT STATION. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): 001
|
| 03/08/2017 |
104212139 |
01 |
A2 |
R PERMIT-ENTIRE |
08/10/2017 |
0069395 PE |
ISLAM |
|
NOT APPLICABLE
|
|
INSTALLATION OF AUTOMATIC CARBON MONOXIDE DETECTION SYSTEM
|
|
Work on Floor(s): CEL,001
|
| 03/29/2016 |
103645619 |
06 |
A2 |
P APPROVED |
03/29/2016 |
|
ROSEMBER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 003
|
| 11/13/2014 |
103647190 |
01 |
A2 |
X SIGNED OFF |
04/19/2021 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
INSTALL TEMPORARY METAL CHIMNEY AND TEMPORARY FUEL STORAGE TANK FOR TEMPOR
|
|
Work on Floor(s): OSP
|
| 09/17/2014 |
103646832 |
01 |
A3 |
X SIGNED OFF |
08/11/2020 |
0069932 PE |
CUNNINGH |
|
NOT APPLICABLE
|
|
FILING APPLICATION FOR 50 LF OF 8'H PLYWOOD CONSTRUCTION FENCE
|
|
Work on Floor(s): OSP
|
| 02/28/2014 |
103645799 |
01 |
A2 |
X SIGNED OFF |
06/04/2015 |
0069395 PE |
ISLAM |
|
NOT APPLICABLE
|
|
PS 145M- FILED HEREWITH ENERGY ANALYSIS ASSOCIATED WITH REPLACEMENT OF EXI
|
|
Work on Floor(s): BAS 001 thru 003
|
| 01/28/2014 |
103645619 |
01 |
A2 |
R PERMIT-ENTIRE |
09/29/2022 |
0093237 PE |
PIMENTA |
|
NOT APPLICABLE
|
|
PS 145M- REMOVE 2 FUEL OIL TANKS AND RELATED PIPING, PUMP AND REPLACE WITH
|
|
Work on Floor(s): CEL 001 thru 003
|
| 01/28/2014 |
103645619 |
05 |
A2 |
R PERMIT-ENTIRE |
12/09/2014 |
0069395 PE |
ISLAM |
|
NOT APPLICABLE
|
|
PS 145M- REPLACING LIGHTING FIXTURES IN BOILER ROOM.
|
|
Work on Floor(s): CEL
|
| 01/28/2014 |
103645619 |
04 |
A2 |
R PERMIT-ENTIRE |
12/09/2014 |
0069970 PE |
GO |
|
NOT APPLICABLE
|
|
PS 145M- INSTALL NEW FLAG POLE AND SUPPORT. RPOVIDE CONCRETE EQUIPMENT PAD
|
|
Work on Floor(s): CEL,ROF
|
| 01/28/2014 |
103645619 |
03 |
A2 |
R PERMIT-ENTIRE |
12/09/2014 |
0025243 RA |
RICARDO |
|
NOT APPLICABLE
|
|
PS 145M- REMOVING 1'-0" MIN OF PAVING TO ACCOMADATE NEW GAS LINE. REPLACE
|
|
Work on Floor(s): OSP,CEL
|
| 01/28/2014 |
103645619 |
02 |
A2 |
R PERMIT-ENTIRE |
12/09/2014 |
0067900 PE |
KHALIL |
|
NOT APPLICABLE
|
|
PS 145M- CAP GAS CONNECTION, DISCONNECT AND REMOVE EXISTING (1) METER AND
|
|
Work on Floor(s): OSP,CEL,001,002,003
|
| 01/13/2014 |
103641445 |
02 |
A2 |
P APPROVED |
01/13/2014 |
|
TULUMELL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,CEL
|
| 11/28/2011 |
103641445 |
01 |
A2 |
X SIGNED OFF |
03/27/2014 |
0031824 RA |
TULUMELL |
|
NOT APPLICABLE
|
|
CONVERSION OF AN EXISTING MIDDLE SCHOOL CLASSROOM INTO A SCIENCE DEMOSTRAT
|
|
Work on Floor(s): 001,CEL
|
| 06/04/2010 |
103886519 |
02 |
A2 |
P APPROVED |
06/04/2010 |
|
SIEGER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 003
|
| 06/22/2009 |
103888116 |
01 |
A2 |
P APPROVED |
06/22/2009 |
0073979 PE |
EID |
|
NOT APPLICABLE
|
|
PS145 LIBRARY UPGRADE REMOVE ALL BUILT-UP CABINETS, FURNITURE, EQ, SINKS,
|
|
Work on Floor(s): 001 thru 002
|
| 02/23/2009 |
103887162 |
01 |
A3 |
X SIGNED OFF |
02/04/2011 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
PS145M - INSTALLATION OF TEMPORARY CONSTRUCTION SCAFFOLD IN CONJUNCTION WI
|
|
Work on Floor(s): OSP
|
| 02/23/2009 |
103887171 |
01 |
A3 |
X SIGNED OFF |
02/04/2011 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
PS145M - INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH
|
|
Work on Floor(s): OSP
|
| 02/23/2009 |
103887153 |
01 |
A3 |
X SIGNED OFF |
02/04/2011 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
PS145M - INSTALLATION OF TEMPORARY CONSTRUCTION SHED IN CONJUNCTION WITH D
|
|
Work on Floor(s): OSP
|
| 09/27/2008 |
103886519 |
01 |
A2 |
X SIGNED OFF |
05/04/2011 |
0018380 RA |
SIEGER |
|
NOT APPLICABLE
|
|
P.S. 145 - M : REMOVE AND REPLACE WINDOWS AS INDICATED INCLUDING EXTERIOR
|
|
Work on Floor(s): CEL,ROF 001 thru 003
|