![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Y180899 | ||
| NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND | ||
| Premises: 5355 HENRY HUDSON PARKWAY BRONX | BIN: 2086250 Block: 5946 Lot: 52 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 5355 HENRY HUDSON PARKWAY | Census Tract: 323 | Health Area: 0100 | |
| SIDEWALK | Admin Area: Y - BRONX | Inspection Area: H | ||
| BRONX, NY 10471 | Community Board: 208 | |||
| DOB Cross Street(s): WEST 252 STREET, WEST 254 STREET | |||
| Status: C - JOB IS SIGNED OFF 12/30/2024 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 01/23/2017 1:05 PM | |
| Application Entered: 01/23/2017 | Job Start Date: 01/24/2017 | ||
| Last Change: 12/30/2024 | Job End Date: 01/23/2018 | ||
| Appointment Status: | |||
| Last Inspection By: GIUSEPPE IMBURGIA On 12/29/2024 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 010527 | Licensee Name: | VASILIOS MATSIKAS | |
| Firm: | 001702 | Firm Name: | TOWER ELECTRIC INC. | |
| Firm Phone: | 718-937-2700 | Firm Address: | 21-19 40TH AVENUE L.I.C. NY 11101 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
W - SIDEWALK SHED WIRING & LIGHTING |
Total Fee: $42.75 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | MARSHALL KANTER | ||||||
| Owner Business Name: | GARTCHESTER REALTY | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| SWK | 10 | 1 | 10 | |||||||||
| Buildings Total | 10 | 1 | 10 | |||||||||
| Total Units : 21 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|
| *NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND |
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 12/29/2024 | 12/30/2024 | GIG | C | (7) | (0) | Y | |||
| INSPECTION COMMENTS: | SHED REMOVED FOR THIS CONTRACTOR | |||||||||