![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: R150681 | ||
| NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND | ||
| Premises: 631 VAN DUZER STREET STATEN ISLAND | BIN: 5014116 Block: 544 Lot: 44 |
| Printable (PDF) version of this Permit | |||||||||||
| DOB NOW: Inspections | |||||||||||
| Filed: | 631 VAN DUZER ST | Census Tract: 21 | Health Area: 0500 | |
| BSMT,1ST FL,2ND FL. | Admin Area: R - STATEN ISLAND | Inspection Area: A | ||
| STATEN IS, NY 10304 | Community Board: 501 | |||
| DOB Cross Street(s): SHELTERVIEW DRIVE, BROAD STREET | |||
| Status: E - ABANDONED 08/22/2025 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 12/02/2016 1:34 PM | |
| Application Entered: 12/02/2016 | Job Start Date: 12/03/2016 | ||
| Last Change: 08/22/2025 | Job End Date: 11/30/2017 | ||
| COMPLETION FEE WAS BILLED | |||
| Appointment Status: | |||
| Last Inspection By: TREJO, JORGE On 10/22/2018 | |||
| Field Disp: J - JOB IN PROGRESS | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011769 | Licensee Name: | ZHENG LI | |
| Firm: | 003451 | Firm Name: | KJK ELECTRIC INC | |
| Firm Phone: | 917-682-3886 | Firm Address: | 79 BRIDGEWATER STREET BROOKLYN NY 11222 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING 8 - BOILER/BURNER WIRING |
Total Fee: $159.50 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: B - Two Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | DAVID LEE | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| BAS | 4 | 7 | 3 | 4 | ||||||||
| 001 | 7 | 15 | 3 | 5 | 7 | |||||||
| 002 | 7 | 15 | 3 | 5 | 7 | |||||||
| Buildings Total | 18 | 37 | 6 | 13 | 18 | |||||||
| Total Units : 92 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 3 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 1 | + New Meters | 3 | - Removed Meters | 1 | = Total Meters | 3 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 12/02/2016 | Notice: | |
| Power Issued: | 12/02/2016 | Response: |
| Follow-Up: | |||
| Contractor's Comments: | |||
|
|
| *NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND |
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 10/22/2018 | 10/23/2018 | JTE | J | (20) | (0) | Y | |||
| INSPECTION COMMENTS: | CONTRACTOR NOT READY FOR FULL INSPECTION | |||||||||