![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M303354 | ||
| NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND | ||
| Premises: 425 EAST 52 STREET MANHATTAN | BIN: 1040153 Block: 1364 Lot: 14 |
| Application Completed and Certified | ||
| Filed: | 425 E 52 ST | Census Tract: 86 | Health Area: 5000 | |
| ALL BUIDING | Admin Area: M - MANHATTAN | Inspection Area: M | ||
| NEW YORK, NY 10022 | Community Board: 106 | |||
| DOB Cross Street(s): 1 AVENUE, DEAD END | |||
| Status: C - JOB IS SIGNED OFF 05/03/2012 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 06/04/2010 3:49 PM | |
| Application Entered: 06/04/2010 | Job Start Date: 06/07/2010 | ||
| Last Change: 05/03/2012 | Job End Date: 05/05/2012 | ||
| Appointment Status: | |||
| Last Inspection By: DALTON HENLON On 03/23/2012 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: | |||
| License #: | 011267 | Licensee Name: | ALEXANDER ABRAMOVICH | |
| Firm: | 002666 | Firm Name: | INTEGRAL ELECL PWR & CNTR | |
| Firm Phone: | 212-645-5528 | Firm Address: | 307 7TH AVENUE,SUITE 301 NEW YORK NY 10001 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $608.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Commercial/Residential (1 Stores, 1 Apartments) | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | CESARE LORENZO | ||||||
| Owner Business Name: | RIVER 52, LLC | ||||||
| Authorized Representative: KONSTANTIN SHAPOROV | |||||||
| Relationship To Owner: REORESENTATIVE | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| BAS | 14 | 15 | 33 | 3 | 1 | |||||||
| 001 | 15 | 9 | 50 | 3 | 32 | |||||||
| 002 | 16 | 10 | 34 | |||||||||
| 003 | 13 | 14 | 37 | |||||||||
| 004 | 15 | 12 | 33 | |||||||||
| 005 | 7 | 11 | 22 | |||||||||
| ROF | 1 | 2 | 20 | 5 | 46 | |||||||
| Buildings Total | 81 | 73 | 229 | 79 | ||||||||
| Total Units : 462 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 1 | |
| Existing Meters | 4 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 4 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 06/04/2010 | Notice: | |
| Power Issued: | 06/04/2010 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: ALL BUILDING RENOVATION | |||
|
|
| *NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND |