| NYC Department of Buildings | ||
| Electrical Application Details for App #: M186282 | ||
| NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND | ||
| Premises: 62 MULBERRY STREET MANHATTAN | BIN: 1088223 Block: 164 Lot: 17 |
| Application Completed and Certified | ||
| Filed: | 62 MULBERRY ST | Census Tract: 29 | Health Area: 7700 | |
| 093168 ROOF TO CELLAR | Admin Area: M - MANHATTAN | Inspection Area: W | ||
| NEW YORK, NY 10013 | Community Board: 103 | |||
| DOB Cross Street(s): MOSCO STREET, BAYARD STREET | |||
| Status: C - JOB IS SIGNED OFF 02/25/2000 | |||
| Request Type: P - PICK-UP | eFiled: NO | ||
| Application Entered: 02/07/2000 | Job Start Date: 02/09/2000 | ||
| Last Change: 02/22/2000 | Job End Date: 02/09/2000 | ||
| Appointment Status: | |||
| Last Inspection By: REDDINGTON, J. On 02/18/2000 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 010786 | Licensee Name: | JOE ZAGO | |
| Firm: | 002041 | Firm Name: | JOVIS ELECTRICAL CORP. | |
| Firm Phone: | 718-302-1666 | Firm Address: | 721 METROPOLITAN AVENUE BROOKLYN NY 11211 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT 9 - OTHER |
Total Fee: $555.00 | ||||||
| Other Work: VIOLATION REMOVAL | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: PARKING GARAGE | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | 62-64 MULBERRY ST CORP | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | 100 | |||||||||||
| Total Units : 100 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | R - OBJECTION(S) RESOL | |
| Power Requested: | Notice: | 02/07/2000 | |
| Power Issued: | Response: | F - FILED TO REMOVE OBJECTION 02/11/2000 |
| Follow-Up: | X - FILED APPL,NOW CLOSED 02/11/2000 | ||
| Contractor's Comments: | |||
|
|
| *NO PRE-BIS PLACE OF ASSEMBLY CERTIFICATES FOUND |