| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/07/2024 |
321524365 |
04 |
A1 |
P APPROVED |
03/27/2024 |
0032338 RA |
SPECTOR |
|
GRANTED 11/12/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ATT,ROF 001 thru 002
|
| 12/28/2023 |
321524365 |
03 |
A1 |
P APPROVED |
01/31/2024 |
|
SPECTOR |
|
GRANTED 11/12/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ATT,ROF 001 thru 002
|
| 11/08/2019 |
340704848 |
01 |
A3 |
X SIGNED OFF |
05/19/2023 |
0032338 RA |
SPECTOR |
|
NOT APPLICABLE
|
|
HEREWITH FILING BUILDERS PAVEMENT PLAN: 50'-0" LINEAR FEET FILED IN CONJUN
|
|
Work on Floor(s): OSP
|
| 11/08/2019 |
340704795 |
01 |
A2 |
X SIGNED OFF |
03/07/2023 |
0072184 PE |
STROH |
|
NOT APPLICABLE
|
|
FILING ALT 2 FOR PARTIAL STRUCTURAL DEMOLITION IN CONJUNCTION WITH ALT 1
|
|
Work on Floor(s): CEL,001,ROF
|
| 11/07/2019 |
340704759 |
01 |
A2 |
H P/E IN PROCESS |
11/07/2019 |
0072184 PE |
STROH |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/07/2019 FILING ALT 2 FOR PARTIAL STRUCTURAL DEMOLITION IN
|
|
Work on Floor(s): CEL,001,ROF
|
| 10/23/2019 |
321524365 |
02 |
A1 |
X SIGNED OFF |
04/05/2024 |
0065639 PE |
KRUPNIK |
|
GRANTED 11/12/2019
|
|
SUBSEQUENT FILING FOR SOE AND FOUNDATION DRAWING.
|
|
Work on Floor(s): BAS,ATT,ROF,001,002
|
| 09/13/2019 |
321524365 |
01 |
A1 |
X SIGNED OFF |
04/05/2024 |
0032338 RA |
SPECTOR |
|
GRANTED 11/12/2019
|
|
RENOVATION OF AN EX'G SINGLE FAMILY DWELLING AS PER DRAWINGS. TWO-STORY
|
|
Work on Floor(s): BAS,ATT,ROF 001 thru 002
|