Disposition |
Disposition |
Inspection |
Date |
|
Date |
Code |
By |
|
| 3 |
01/08/2025 |
L2 |
STOP WORK ORDER FULLY RESCINDED |
3149 |
01/08/2025 |
| |
|
|
Means and method for safe demolition operation was provided. Ok to fully rescind the full stop work order to commence construction activities. #2369 |
|
| 2 |
12/14/2024 |
A3 |
FULL STOP WORK ORDER SERVED |
3339 |
12/13/2024 |
| |
|
|
FULL STOP WORK ORDER ISSUED FOR INCIDENT,CONSTRUCTION AND DEMOLITION OPERATION UNDER CSE AUDIT ******** AUDIT ******** |
|
| 1 |
12/13/2024 |
A1 |
BUILDINGS VIOLATION(S) SERVED |
3339 |
12/13/2024 |
| |
|
|
Incident occurred when two workers were performing demolition work at exposure 2 bricks wall using jackhammer while they were operating 80' Telescopic Boom Lift, where one worker was fatally injured, and the second one got a broken arm. DOB violation was warranted for failure to safeguard along with full stop work order for the entire site waiting for further investigation #2846 |
|