3 |
07/20/2023 |
L2 |
STOP WORK ORDER FULLY RESCINDED |
3416 |
07/20/2023 |
|
|
|
Ok to full rescind. Provided for prior incident of acetylene tank exploded injuring workers was a detailed means n methods, JHA and toolbox talks. Means n methods stated that doesn't permit the unlawful storage of flammable gases on site. No flammable gases on site during inspection. Fire extinguishers in place. |
|
2 |
07/12/2023 |
L1 |
PARTIAL STOP WORK ORDER |
3149 |
07/12/2023 |
|
|
|
An explosion of flammable acetylene tanks that was stored in a gang box overnight on 34 floor,2 workers injured. Inspection reveals sawzall was used to cut the padlock that generate spark that led to explosion,freight elevator used for construction activities with expired permit failure to comply with FDNY code. Stop all hot work operation on site and use of elevator for construction activities provide safety measures and renew permit for operation going forward.Request CSE for reinspection. |
|
1 |
07/12/2023 |
EJ |
COMPLAINT ASSIGNED TO CONSTRUCTION SAFETY ENFORCEMENT |
2283 |
07/12/2023 |
|
|
|
REFER TO CSE |
|