| NYC Department of Buildings | ||
| Overview for Complaint #:5106705 = RESOLVED | ||
| Complaint at: 70 CHAPIN AVENUE | BIN: 5022542 | Borough: STATEN ISLAND | ZIP: 10304 | |||
| Re: CORRESPONDENCE ALLEGES ALT 1 # 520128549 MAY HAVE DEMOLISHED ALL WALLS AND FLOOR BEAMS MAKING THIS A NEW BLDG AS PER TPPN 1/02VERIFY IF IN COMPLIANCE WITH PLANS | ||||||
| Category Code: | 83 CONSTRUCTION - CONTRARY/BEYOND APPROVED PLANS/PERMITS | |
| Assigned To: | STATEN ISLAND CONSTRUCTION ENFORCEMENT | Priority: B |
| Received: | 09/30/2013 08:28 | Block: 869 | Lot: 613 | Community Board: 502 | ||
| Owner: | X X | |||||
| Last Inspection: | 12/20/2013 - - BY BADGE # 1795 |
| Disposition: | 12/20/2013 - L2 - STOP WORK ORDER FULLY RESCINDED |
| Comments: | NEW BUILDING APPLICATION FILED AS REQUIRED UNDER TPPN 1-02 # 520165231 AND VIOLATION # 35011250Y PD |
| Prev DOB Violation #: | 100713C02JB02 |
| Prev ECB Violation #: | 35011250Y |
| Complaint Disposition History |
| # | Disposition | Disposition | Inspection | Date | |
| Date | Code | By | |||
| 3 | 12/20/2013 | L2 | STOP WORK ORDER FULLY RESCINDED | 1795 | 12/20/2013 |
| NEW BUILDING APPLICATION FILED AS REQUIRED UNDER TPPN 1-02 # 520165231 AND VIOLATION # 35011250Y PD | |||||
| 2 | 10/08/2013 | A3 | FULL STOP WORK ORDER SERVED | 0363 | 10/07/2013 |
| WORK DOES NOT CONFORM TO ALT 1 520128549 ALL WALLS AND FLOOR BEAMS REMOVED CONTRARY TO TPPN 1-02 REQUIRING NB PERMIT | |||||
| 1 | 10/02/2013 | C1 | INSPECTOR UNABLE TO GAIN ACCESS - 1ST ATTEMPT | 0363 | 10/01/2013 |
| COULD NOT GAIN ACCESS INTO CONSTRUCTION SITE LS4 POSTED | |||||