Disposition |
Disposition |
Inspection |
Date |
|
Date |
Code |
By |
|
| 3 |
12/01/2017 |
L2 |
STOP WORK ORDER FULLY RESCINDED |
2874 |
12/01/2017 |
| |
|
|
RESCIND SWO AT TIME OF APPOINTMENT INSPECTION AMEND PLAN WAS SHOWN AND SUBSTANTIALLY CONFORM TO PROPOSE WORK. |
|
| 2 |
11/02/2017 |
A3 |
FULL STOP WORK ORDER SERVED |
2756 |
11/01/2017 |
| |
|
|
JOB # 421533353 ISSUED ON 10/24/2017 . APPROVED PLAN AT SITE DOES NOT CONFORM TO WORK. PLAN SHOWS EXISTING FRONT PORTION OF THE BUILDING HAVE EXISTING FLOOR JOISTS BUT THEY REMOVED ALL FLOOR JOISTS EXCEPT 3 . NOT OK TO LIFT SWO |
|
| 1 |
07/11/2017 |
A3 |
FULL STOP WORK ORDER SERVED |
2756 |
07/07/2017 |
| |
|
|
REAR EXTENSION OF 27'X20'X 25?H? OBSERVED AT TIME OF INSPECTION. PERMIT # 421478537 POSTED ONLY TO REMOVE REAR EXTERIOR AND INTERIOR PARTITIONS. FULL SWO ISSUED FOR WORK WITHOUT PERMIT. NO APPROVED PLAN FOR JOB 3 421478537 AT SITE. ALL INTERIOR PARTITION AND SUB FLOORS AT EXISTING AREA REMOVED AT TIME OF INSPECTION. 40% OF WORK COMPLETED. |
|