Disposition |
Disposition |
Inspection |
Date |
|
Date |
Code |
By |
|
| 3 |
08/03/2026 |
L1 |
PARTIAL STOP WORK ORDER |
3188 |
07/30/2026 |
| |
|
|
At the time of my inspection of a 17 story new building at foundationexcavation, I observed underpinning in progress at exposure#4 adjacent building, Investigation reveal that due to inadequate SOE, monitoring and material failure resulting basement cracks to the roof with sink hole. This creates a collapsing hazard endangering public and property. Also no notification made of the incident. Request CSE for reinspection CSE AUDIT |
|
| 2 |
07/31/2026 |
L1 |
PARTIAL STOP WORK ORDER |
3188 |
07/30/2026 |
| |
|
|
17 story new building at foundation excavation phase, I observed underpinning in progress at exposure #4. Investigation reveal that due to inadequate SOE and monitoring resulting building basement crack with a sink hole creating a collapsing hazard for adjacent property. no site safety manager on site, construction fence missing and no earthwork notification. Stop all work entire jobsite, Only allowed to provide safety monitoring and emergency work. Request CSE for reinspection CSE AUDIT |
|
| 1 |
07/30/2026 |
EJ |
COMPLAINT ASSIGNED TO CONSTRUCTION SAFETY ENFORCEMENT |
2980 |
07/30/2026 |
| |
|
|
EJ - REFER TO CSE |
|