Overview for Complaint #:3A73691 = RESOLVED
Complaint at:  67 4 AVENUE BIN: 3018509    Borough: BROOKLYN    ZIP: 11217
Re:  EXCAATION OPERATION IS AFFECTING ADJACENT PROPERTY

Category Code: 14      EXCAVATION - UNDERMINING ADJACENT BUILDING

Special District: G - GOWANUS MIXED USE

Assigned To: CONSTRUCTION SAFETY ENFORCMENT Priority:  A    

Received:   07/30/2026      Block:  932 Lot:  6   Community Board:  306
Owner:   X X  

Last Inspection:   07/30/2026 - - BY BADGE # 3188
Disposition:   08/03/2026 - L1 - PARTIAL STOP WORK ORDER
ECB Violation #:    39557409R  39557408P 
Comments:   At the time of my inspection of a 17 story new building at foundationexcavation, I observed underpinning in progress at exposure#4 adjacent building, Investigation reveal that due to inadequate SOE, monitoring and material failure resulting basement cracks to the roof with sink hole. This creates a collapsing hazard endangering public and property. Also no notification made of the incident. Request CSE for reinspection CSE AUDIT
Prev ECB Violation #:    39557340H  39557341J  39557342L  39557343N 

Complaint Disposition History

#      Disposition Disposition Inspection Date
Date Code By
 08/03/2026      L1  PARTIAL STOP WORK ORDER        3188       07/30/2026 
      At the time of my inspection of a 17 story new building at foundationexcavation, I observed underpinning in progress at exposure#4 adjacent building, Investigation reveal that due to inadequate SOE, monitoring and material failure resulting basement cracks to the roof with sink hole. This creates a collapsing hazard endangering public and property. Also no notification made of the incident. Request CSE for reinspection CSE AUDIT
 07/31/2026      L1  PARTIAL STOP WORK ORDER        3188       07/30/2026 
      17 story new building at foundation excavation phase, I observed underpinning in progress at exposure #4. Investigation reveal that due to inadequate SOE and monitoring resulting building basement crack with a sink hole creating a collapsing hazard for adjacent property. no site safety manager on site, construction fence missing and no earthwork notification. Stop all work entire jobsite, Only allowed to provide safety monitoring and emergency work. Request CSE for reinspection CSE AUDIT
 07/30/2026      EJ  COMPLAINT ASSIGNED TO CONSTRUCTION SAFETY ENFORCEMENT        2980       07/30/2026 
      EJ - REFER TO CSE