Disposition |
Disposition |
Inspection |
Date |
|
Date |
Code |
By |
|
| 2 |
04/14/2026 |
L2 |
STOP WORK ORDER FULLY RESCINDED |
2797 |
04/14/2026 |
| |
|
|
At the time of my re-inspection of a new building at foundationexcavation phase, wth PSWO on site for the missing job site fence at exposure 2 3, also missing piles and lagging at exposure # 2. Upon review of the approved site safety plans provided all conditions on site were adequately provided as required. No unsafe conditions observed. All operations may resume on this job site..Previous ECB 39552509L 39552508J |
|
| 1 |
04/02/2026 |
L1 |
PARTIAL STOP WORK ORDER |
3630 |
04/02/2026 |
| |
|
|
At the time of my inspection of an eight-story building in the foundation excavation phase, I observed at Exp# 2 that lagging and piles were missing, contrary to the approved S.O.E. plans. Additionally, construction fencing was missing at Exp# 3 and 4, allowing unrestricted public access to the job site. These conditions are hazardous to the public and property. Stop all work on the entire job site except to install the required S.O.E. and construction fencing as per approved plans. Contact CSE |
|