Disposition |
Disposition |
Inspection |
Date |
|
Date |
Code |
By |
|
| 3 |
08/13/2025 |
L2 |
STOP WORK ORDER FULLY RESCINDED |
3637 |
08/13/2025 |
| |
|
|
At time of my inspection observed no water pumping off site No accumulating of water on site. Therefore No DEP permit provided. |
|
| 2 |
08/07/2025 |
L3 |
STOP WORK ORDER PARTIALLY RESCINDED |
3630 |
08/07/2025 |
| |
|
|
At the time of my inspection a propose seven story building upon request for required documents a engineer report was provided for underpinning sequence The site safety plan was updated with means of egress, No D,E,P permit was provided for water disposal on Street Obtain D, E, P permit for water disposal are means and method No work allow only to obtain D,E,P permit |
|
| 1 |
07/17/2025 |
L1 |
PARTIAL STOP WORK ORDER |
3332 |
07/17/2025 |
| |
|
|
JOBSITE UNDERPINNING IS CONTRARY TO PROVIDED APPROVED DRAWAINGS. STOP ALL SOEUNDERPINNING OPERATIONS, ALLOWED TO COMPLETE CURRENT SECTION. CONFORM WORK TO APPROVED DRAWINGSAMENDEMENTS. DEWATERING TAKING PLACE STREET LVL WOUT DEP PERMIT. STOP ALL DEWATERING. OBTAIN DEP PERMIT FOR DEWATERING OPERATIONS. INADEQUATE INGRESSEGRESS ON JOBSITE WOUT CONTROLLED ACCESS ZONES FOR JOBSITE SAFETY. STOP ALL SOE OPERATIONS. PROVIDE MEANSMETHODS FOR SAFE WORK OPERATIONS |
|