![]() |
|
|
| NYC Department of Buildings | ||
| Overview for Complaint #:3A14647 = CLOSED | ||
| Complaint at: 59 GRAND STREET | BIN: 3425932 | Borough: BROOKLYN | ZIP: 11249 | |||
| Re: CORRECTIVE ACTION PLAN REQ'D. OBSVD @ EXP1 PARTIALLY BULGEDOUTWARD ON 2-3-4 FLRS DECORATIVE STONE WINDOWS IN DISREPAIR,VERTICALCRACKS @ EXP1/4 CORNER OF BLDG,BRICKS @ EXP4 WALL ARE BULGING | ||||||
| Category Code: | 2F BUILDING UNDER STRUCTURAL MONITORING | |
| Special District: | MX-8 - MIXED USE-8 (GREENPOINT-WILLIAMSBURG, BK) | |
| Assigned To: | FORENSIC ENGINEERING | Priority: D |
| Received: | 05/22/2025 11:16 | Block: 2378 | Lot: 7503 | Community Board: 301 | ||
| Owner: | UNAVAILABLE OWNER | |||||
| Last Inspection: | 03/27/2026 - - BY BADGE # 3629 |
| Disposition: | 03/27/2026 - N2 - OWNERS ENGINEERING REPORT ACCEPTED |
| DOB Violation #: | 052025PI30103HZ 082925PI30101SB 120825PI301TC01 |
| ECB Violation #: | 35718990Z |
| Comments: | RDP REPORT DATED 03/20/2026 REVIEWED AND ACCEPTED |
| Prev ECB Violation #: | 35685329H |
| Complaint Disposition History |
| # | Disposition | Disposition | Inspection | Date | |
| Date | Code | By | |||
| 7 | 03/27/2026 | N2 | OWNERS ENGINEERING REPORT ACCEPTED | 3629 | 03/27/2026 |
| RDP REPORT DATED 03/20/2026 REVIEWED AND ACCEPTED | |||||
| 6 | 12/08/2025 | A8 | ECB VIOLATION SERVED | 3731 | 12/08/2025 |
| COMPLY WITH COMMISSIONER'S ORDER | |||||
| 5 | 11/14/2025 | A8 | ECB VIOLATION SERVED | 3731 | 11/13/2025 |
| COMPLY WITH COMMISSIONER'S ORDER | |||||
| 4 | 11/14/2025 | A8 | ECB VIOLATION SERVED | 3618 | 11/13/2025 |
| COMPLY WITH COMMISSIONER'S ORDER | |||||
| 3 | 10/15/2025 | N1 | OWNERS ENGINEERING REPORT REQUIRED | 3618 | 08/29/2025 |
| FTC-IMMED COMPLY W/COMMISSIONER'S ORDER(CONTROL#348271 VIO# 052025PI30103HZ TO PROVIDE A CORRECTIVE ACTION PLAN | |||||
| 2 | 07/31/2025 | N3 | OWNERS ENGINEERING REPORT RECEIVED AND UNDER REVIEW | 3629 | 07/30/2025 |
| OWNER'S ENGINEERING REPORT UNDER REVIEW | |||||
| 1 | 05/22/2025 | N1 | OWNERS ENGINEERING REPORT REQUIRED | 3152 | 05/20/2025 |
| OWNER TO IMMED RETAIN NYSPE TO EVAL THE ENTIRE BLDG AND TO SUBMIT CORRECTIVE ACTION PLAN WITHIN 30 DAYS | |||||