Disposition |
Disposition |
Inspection |
Date |
|
Date |
Code |
By |
|
| 3 |
04/11/2025 |
AF |
CLASS 1 CONDITION RESOLVED |
3291 |
04/11/2025 |
| |
|
|
Violation# 39537158N corrected, SWS removed |
|
| 2 |
02/20/2025 |
A8 |
ECB VIOLATION SERVED |
2797 |
02/20/2025 |
| |
|
|
At the time of my inspection of a 6 story new building under construction currently topped off at roof level. Responding to a incident job site which occurred on o2-14-2025. DOB records reveal that notification was not given to the department in a timely fashion as required which created a hazardous unsafe condition at the site. ECB violation issued for non compliance. |
|
| 1 |
02/20/2025 |
A8 |
ECB VIOLATION SERVED |
2797 |
02/19/2025 |
| |
|
|
At the time of my inspection of a 6 story mew building with side walk shed and scaffold removal at exposure 4. There was an incident on 02-14-2025 while workers were removing the temporary construction equipment. A worker was injured in the dismantling operation and was taken to area hospital. As per rule DOB should have been notified immediately as required, As of 02-18-2025 departmental reveals that no notification was made to the department creating a hazardous and unsafe condition on site. |
|