![]() |
|
|
| NYC Department of Buildings | ||
| Overview for Complaint #:3901403 = RESOLVED | ||
| Complaint at: 1925 EAST 24 STREET | BIN: 3197314 | Borough: BROOKLYN | ZIP: 11229 | |||
| Re: there is a house where there is an extension being donewithout a permit. this is at the back of the house. | ||||||
| Category Code: | 83 CONSTRUCTION - CONTRARY/BEYOND APPROVED PLANS/PERMITS | |
| Assigned To: | BROOKLYN CONSTRUCTION ENFORCEMENT | Priority: B |
| 311 Reference Number: 311-14174568 | ||
| Received: | 04/18/2023 | Block: 7303 | Lot: 78 | Community Board: 315 | ||
| Owner: | SOUID, IZAK | |||||
| Last Inspection: | 08/02/2023 - - BY BADGE # 3123 |
| Disposition: | 08/02/2023 - L2 - STOP WORK ORDER FULLY RESCINDED |
| Comments: | L2-ATOI ACTIVE STRUCTURAL PERMIT # B00531904 ON FILE. CONDITIONS ON SITE CONFORMS TO APPROVED DRAWINGS REVIEWED. SAFEGUARDS WERE OBSERVED ADEQUATE. L2 FOR CP ON FILE. OK TO RETURN TO WORK, NO OBJECTION TO AN ADMINISTRATIVE DISMISSAL OF SWO #'S 39087049Z, 50X 51H. |
| Prev ECB Violation #: | 39087049Z 39087050X 39087051H |
| Complaint Disposition History |
| # | Disposition | Disposition | Inspection | Date | |
| Date | Code | By | |||
| 3 | 08/02/2023 | L2 | STOP WORK ORDER FULLY RESCINDED | 3123 | 08/02/2023 |
| L2-ATOI ACTIVE STRUCTURAL PERMIT # B00531904 ON FILE. CONDITIONS ON SITE CONFORMS TO APPROVED DRAWINGS REVIEWED. SAFEGUARDS WERE OBSERVED ADEQUATE. L2 FOR CP ON FILE. OK TO RETURN TO WORK, NO OBJECTION TO AN ADMINISTRATIVE DISMISSAL OF SWO #'S 39087049Z, 50X 51H. | |||||
| 2 | 05/24/2023 | A3 | FULL STOP WORK ORDER SERVED | 3252 | 05/24/2023 |
| POURED CONCRETE FOUNDATION, STRUCTURAL STEEL AND NEW WOOD FRAMING THROUGHOUT WITHOUT STRUCTURAL PERMITS. A FULL SET OF PLANS COULD NOT BE PROVIDED UPON REQUEST AND MISSING GUARD RAILS AT STAIRWELL. STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE. | |||||
| 1 | 04/18/2023 | D1 | COMPLAINT ASSIGNED TO CONSTRUCTION ENFORCEMENT | 1795 | 04/18/2023 |
| REASSIGNED, CATEGORY 83, ACTIVE PERMIT B00531904 EXPIRE 11/8/23 FOR INTERIOR WORK AND HORIZONTAL ENLARGEMENT, VERIFY CONFORMANCE TO PLAN | |||||