Disposition |
Disposition |
Inspection |
Date |
|
Date |
Code |
By |
|
| 7 |
02/25/2020 |
L2 |
STOP WORK ORDER FULLY RESCINDED |
3039 |
02/24/2020 |
| |
|
|
PROVIDED TPP,ADEQUATE JOB SITE FENCE,BACKFILLED AND NOTIFIED TO DOB. OK TO RESCIND |
|
| 6 |
02/21/2020 |
Y5 |
STOP WORK REINSPECTION FAILURE |
3127 |
02/19/2020 |
| |
|
|
NO TPP ON SITE,CONSTR FENCE FACING WRONG DIRECTION AND HAS E XPOSED NAILS,NO LOG BOOKS ON SITE |
|
| 5 |
01/23/2020 |
L3 |
STOP WORK ORDER PARTIALLY RESCINDED |
3072 |
01/23/2020 |
| |
|
|
ONLY WORK ALLOW-COMPLETE INSTALLATION OF TEMP SUPP LVL BEAMS AS PER DRAWINGS.COMPLETE TENANT PROTECTIONS AS PER PLANS |
|
| 4 |
01/09/2020 |
Y5 |
STOP WORK REINSPECTION FAILURE |
2995 |
01/09/2020 |
| |
|
|
RESCIND HAS BEEN DENIED DUE TO THE VIOLATING CONDITIONS NOT YET BEING ADEQUATELY COMPLIED WITH. RE-INSPECTION NEEDED |
|
| 3 |
01/09/2020 |
Y5 |
STOP WORK REINSPECTION FAILURE |
2841 |
01/09/2020 |
| |
|
|
SWO ISUUED FAILURE TO PROTECT SIDES OF EXCAVATION..NO RULE 5 2 B#2841 EX/ID#2619....ENGINEERING AUDIT******* |
|
| 2 |
10/02/2018 |
A3 |
FULL STOP WORK ORDER SERVED |
2841 |
09/19/2018 |
| |
|
|
SWO ISUUED FAILURE TO PROTECT SIDES OF EXCAVATION..NO RULE 5 2 B#2841 EX/ID#2619....ENGINEERING AUDIT******* |
|
| 1 |
09/19/2018 |
A3 |
FULL STOP WORK ORDER SERVED |
2841 |
09/19/2018 |
| |
|
|
SWO ISUUED FAILURE TO PROTECT SIDES OF EXCAVATION..NO RULE 5 2 B#2841 EX/ID#2619 |
|