![]() |
|
|
| NYC Department of Buildings | ||
| Overview for Complaint #:3565752 = RESOLVED | ||
| Complaint at: 1051 BARBEY STREET | BIN: 3098284 | Borough: BROOKLYN | ZIP: 11207 | |||
| Re: UTILITY CO. FOUND A PIPE BYPASS IN THE CELLAR AND THEYLOCKED THE METER VALVE | ||||||
| Category Code: | 1L GAS UTILITY REFERRAL | |
| Assigned To: | PLUMBING DIVISION | Priority: D |
| Received: | 06/23/2016 | Block: 4422 | Lot: 59 | Community Board: 305 | ||
| Owner: | BELONE, HECTOR | |||||
| Last Inspection: | 02/04/2020 - - BY BADGE # 2298 |
| Disposition: | 02/04/2020 - L2 - STOP WORK ORDER FULLY RESCINDED |
| Comments: | SWO LIFT FOR PLUMBING WORK. ALL WORK COVERED UNDER LAA # B00273723. FEES PAID UNDER INVOICE # 62147328 |
| Prev DOB Violation #: | 072516PL05AF01 072516PL05AF02 072516PL05AF03 |
| Prev ECB Violation #: | 35181666J 35181667L 35181668N |
| Complaint Disposition History |
| # | Disposition | Disposition | Inspection | Date | |
| Date | Code | By | |||
| 3 | 02/04/2020 | L2 | STOP WORK ORDER FULLY RESCINDED | 2298 | 02/04/2020 |
| SWO LIFT FOR PLUMBING WORK. ALL WORK COVERED UNDER LAA # B00273723. FEES PAID UNDER INVOICE # 62147328 | |||||
| 2 | 07/26/2016 | L1 | PARTIAL STOP WORK ORDER | 2554 | 07/25/2016 |
| NEWLY INSTALLED GAS PIPING AND FITTINGS IN CELLAR WITH NO PERMITS, INSPECTIONS OR TEST PARTIAL STOP WORK ORDER ON ALL GAS WORK FOR ENTIRE BUILDING | |||||
| 1 | 07/22/2016 | C1 | INSPECTOR UNABLE TO GAIN ACCESS - 1ST ATTEMPT | 2554 | 07/22/2016 |
| KNOCKED ON DOOR- NO ANSWER POSTED LS4 | |||||