Disposition |
Disposition |
Inspection |
Date |
|
Date |
Code |
By |
|
| 5 |
06/23/2016 |
L2 |
STOP WORK ORDER FULLY RESCINDED |
2685 |
06/22/2016 |
| |
|
|
APPOINTMENT WAS NOT KEPT. SWO RESCINDED ON 6/10/16 |
|
| 4 |
03/30/2016 |
A3 |
FULL STOP WORK ORDER SERVED |
2251 |
03/25/2016 |
| |
|
|
A3 FULL SWO IN EFFECT. STRUCTURAL COLUMNS INSTALLED AT FIRST FLOOR & FRONT CELLAR ENTRY CONTRARY TO PLANS. RESCIND DENIED |
|
| 3 |
03/30/2016 |
A3 |
FULL STOP WORK ORDER SERVED |
2251 |
03/29/2016 |
| |
|
|
A3 FULL SWO IN EFFECT. STRUCTURAL COLUMNS INSTALLED AT FIRST FLOOR & FRONT CELLAR ENTRY CONTRARY TO PLANS. RESCIND DENIED |
|
| 2 |
02/16/2016 |
L1 |
PARTIAL STOP WORK ORDER |
2512 |
02/16/2016 |
| |
|
|
WORK WITHOUT A PERMIT, FULL HEIGHT PARTITIONS AT CELLAR LEVEL, WITH A FULL 3 PIECE BATHROOM. INOPERABLE CO DETECTOR |
|
| 1 |
02/02/2016 |
L1 |
PARTIAL STOP WORK ORDER |
2512 |
01/28/2016 |
| |
|
|
WORK WITHOUT A PERMIT, FULL HEIGHT PARTITIONS AT CELLAR LEVEL, WITH A FULL 3 PIECE BATHROOM. |
|