![]() |
|
|
| NYC Department of Buildings | ||
| Overview for Complaint #:3544896 = RESOLVED | ||
| Complaint at: 373 BERGEN STREET | BIN: 3018464 | Borough: BROOKLYN | ZIP: 11217 | |||
| Re: WORK IS BEING DONE ALTHOUGH THERE IS A STOP WORK ORDER IN EFFECT. THEY ARE REMOVING STRUCTURAL ELEMENTS FROM THE BUILDING, INCLUDING BRICKS. THEY ARE DEMOLISHING BRICK WALLS AND THROWING THEM IN BACK. | ||||||
| Category Code: | 86 WORK CONTRARY TO STOP WORK ORDER | |
| DOB POSTED NOTICE OR ORDER : STOP WORK ORDER - NON-COMPLIANCE | ||
| Assigned To: | BROOKLYN CONSTRUCTION ENFORCEMENT | Priority: A |
| 311 Reference Number: 1-1-1203150341 | ||
| Received: | 01/22/2016 | Block: 930 | Lot: 67 | Community Board: 306 | ||
| Owner: | 373 BERGEN STREET, LLC | |||||
| Last Inspection: | 01/26/2016 - - BY BADGE # 2685 |
| Disposition: | 01/26/2016 - I2 - NO VIOLATION WARRANTED FOR COMPLAINT AT TIME OF INSPECTION |
| Comments: | NO CONSTRUCTION ACTIVITIES OBSERVED ON TIME OF INSPECTION. |
| Complaint Disposition History |
| # | Disposition | Disposition | Inspection | Date | |
| Date | Code | By | |||
| 3 | 01/26/2016 | I2 | NO VIOLATION WARRANTED FOR COMPLAINT AT TIME OF INSPECTION | 2685 | 01/26/2016 |
| NO CONSTRUCTION ACTIVITIES OBSERVED ON TIME OF INSPECTION. | |||||
| 2 | 01/25/2016 | C3 | ACCESS DENIED - 1ST ATTEMPT | 2188 | 01/25/2016 |
| ACCESS INSIDE DENIED BY A MALE. LS4 POSTED. | |||||
| 1 | 01/25/2016 | D1 | COMPLAINT ASSIGNED TO CONSTRUCTION ENFORCEMENT | 2633 | 01/25/2016 |
| REFER TO CONSTRUCTION UNIT. | |||||