![]() |
|
|
| NYC Department of Buildings | ||
| Overview for Complaint #:3403301 = RESOLVED | ||
| Complaint at: 74 CLERMONT AVENUE | BIN: 3058103 | Borough: BROOKLYN | ZIP: 11205 | |||
| Re: CLR STS THAT EVERYTHING INTERNALLY IS HOOKUPED INCORRECTLYTO THE GAS METER | ||||||
| Category Code: | 65 GAS HOOK-UP/PIPING - ILLEGAL OR DEFECTIVE | |
| Assigned To: | BROOKLYN CONSTRUCTION ENFORCEMENT | Priority: A |
| Received: | 02/12/2012 11:08 | Block: 2045 | Lot: 59 | Community Board: 302 | ||
| Owner: | DAVILA , HAROLD | |||||
| Last Inspection: | 02/14/2012 - - BY BADGE # 2438 |
| Disposition: | 02/15/2012 - A8 - ECB VIOLATION SERVED |
| DOB Violation #: | 02142012P302EDB1 |
| ECB Violation #: | 34942676K |
| Comments: | PRO VENT INSTALLED ABOVE EJECTOR WHICH NEEDS CORRECT VENT |
| Complaint Disposition History |
| # | Disposition | Disposition | Inspection | Date | |
| Date | Code | By | |||
| 4 | 02/15/2012 | A8 | ECB VIOLATION SERVED | 2438 | 02/14/2012 |
| PRO VENT INSTALLED ABOVE EJECTOR WHICH NEEDS CORRECT VENT | |||||
| 3 | 02/13/2012 | C1 | INSPECTOR UNABLE TO GAIN ACCESS - 1ST ATTEMPT | 2438 | 02/13/2012 |
| NO ACCESS 1ST ATTEMPT LS4 LEFT | |||||
| 2 | 02/13/2012 | D2 | COMPLAINT ASSIGNED TO PLUMBING UNIT | 1766 | 02/13/2012 |
| REFER TO PLUMBING | |||||
| 1 | 02/13/2012 | D2 | COMPLAINT ASSIGNED TO PLUMBING UNIT | 1766 | 02/13/2012 |
| REFER TO BOROUGH | |||||