![]() |
|
|
| NYC Department of Buildings | ||
| Overview for Complaint #:3374541 = RESOLVED | ||
| Complaint at: 182 3 AVENUE | BIN: 3336092 | Borough: BROOKLYN | ZIP: 11217 | |||
| Re: COLUMNS SHIFTING,THE BEAMS WERE SAGGING ON BOTH THE 1ST AND2ND FLOORS AS WELL AS MASONRY WAS CRACKING AND THIS IS ALSO HAPPENINGIN BLDGS 265&271 DOUGLAS ST.&190 3RD AVE WHICH ARE PART OF THE COMPLEX | ||||||
| Category Code: | 10 DEBRIS/BUILDING - FALLING OR IN DANGER OF FALLING | |
| Assigned To: | BROOKLYN CONSTRUCTION ENFORCEMENT | Priority: A |
| Received: | 04/19/2011 11:43 | Block: 412 | Lot: 34 | Community Board: 306 | ||
| Owner: | FORTUNE JD LLC | |||||
| Last Inspection: | 04/20/2011 - - BY BADGE # 2338 |
| Disposition: | 04/20/2011 - A8 - ECB VIOLATION SERVED |
| DOB Violation #: | 042011C06AA01 |
| ECB Violation #: | 34901253H |
| Comments: | NO ACCESS TO 2ND FL LEVEL. SOME DETERIORATION/CRACKS TO 2ND FL WOOD GIRDER AND A 2 VERTICAL CRACKS/EXT MASONRY WALL |
| Complaint Disposition History |
| # | Disposition | Disposition | Inspection | Date | |
| Date | Code | By | |||
| 2 | 04/20/2011 | A8 | ECB VIOLATION SERVED | 2338 | 04/20/2011 |
| NO ACCESS TO 2ND FL LEVEL. SOME DETERIORATION/CRACKS TO 2ND FL WOOD GIRDER AND A 2 VERTICAL CRACKS/EXT MASONRY WALL | |||||
| 1 | 04/19/2011 | C1 | INSPECTOR UNABLE TO GAIN ACCESS - 1ST ATTEMPT | 2374 | 04/19/2011 |
| NO ACCESS TO INTERIOR TO INSPECT, LS4 POSTED | |||||