![]() |
|
|
| NYC Department of Buildings | ||
| Overview for Complaint #:1670519 = RESOLVED | ||
| Complaint at: 319 EAST 24 STREET | BIN: 1078830 | Borough: MANHATTAN | ZIP: 10010 | |||
| Re: PSWOS OR FSWOS | ||||||
| Category Code: | 8A CONSTRUCTION SAFETY COMPLIANCE ACTION | |
| CONSTRUCTION SAFETY COMPLIANCE ACTIONS : MAJOR BUILDING | ||
| Assigned To: | CONSTRUCTION SAFETY COMPLIANCE | Priority: D |
| Received: | 06/17/2024 | Block: 930 | Lot: 12 | Community Board: 106 | ||
| Owner: | EAST MIDTOWN PLAZA | |||||
| Last Inspection: | 08/05/2024 - - BY BADGE # 3073 |
| Disposition: | 08/05/2024 - L2 - STOP WORK ORDER FULLY RESCINDED |
| Comments: | Permitted to continue use of suspended scaffolding. |
| Prev ECB Violation #: | 39529705N |
| Complaint Disposition History |
| # | Disposition | Disposition | Inspection | Date | |
| Date | Code | By | |||
| 2 | 08/05/2024 | L2 | STOP WORK ORDER FULLY RESCINDED | 3073 | 08/05/2024 |
| Permitted to continue use of suspended scaffolding. | |||||
| 1 | 06/17/2024 | L1 | PARTIAL STOP WORK ORDER | 3393 | 06/17/2024 |
| Proposed facade repairs to a 29 stories, 248ft high occupied building that is deemed UNSAFE, job# M00877282.At the time of my inspection I observed an active site. I also observed that the installed Riggs are different from the ones on the approved CD5. The frames are different and there is insulation and the drawings does not require insulation. 1 PSWO ISSUED. | |||||