Disposition |
Disposition |
Inspection |
Date |
|
Date |
Code |
By |
|
| 3 |
11/29/2023 |
AF |
CLASS 1 CONDITION RESOLVED |
3086 |
11/29/2023 |
| |
|
|
CLASS 1 VIOLATION CONDITIONS CORRECTED AND ALREADY GIVEN A FULL LIFT DATED 08-25-2023 BY BADGE-3073. CONDITIONS RESOLVED. |
|
| 2 |
08/25/2023 |
L2 |
STOP WORK ORDER FULLY RESCINDED |
3073 |
08/25/2023 |
| |
|
|
Permitted to continue work. |
|
| 1 |
08/22/2023 |
L1 |
PARTIAL STOP WORK ORDER |
3284 |
08/22/2023 |
| |
|
|
5 STORY BUILDING UNDERGOING 4TO1 FAMILY CONVERSION, OBSERVED ACTIVE SITE WITH SEVERAL WORKERS EXCAVATING AT CELLAR LEVEL. PSWO ISSUED WITH 3 VIOLATIONS, FOR EXCAVATION SEQUENCE DOES NOT MENTION ROCK BREAKING AT THE REAR, 4 PERMITS PROVIDED DO NOT SHOW VERTICAL AND HORIZONTAL EXTENSION, NO PRECONSTRUCTION SURVEY AND DIESEL FUEL STORED AROUND COMBUSTIBLES. STOP ALL EXCAVATION AND STRUCTURAL WORK. OK TO REMOVE DEBRIS AND HOUSEKEEP. |
|