![]() |
|
|
| NYC Department of Buildings | ||
| Overview for Complaint #:1492007 = RESOLVED | ||
| Complaint at: 200 AMSTERDAM AVENUE | BIN: 1030358 | Borough: MANHATTAN | ZIP: 10023 | |||
| Category Code: | 83 CONSTRUCTION - CONTRARY/BEYOND APPROVED PLANS/PERMITS | |
| CONSTRUCTION IN PROGRESS : CONTRARY TO PLAN | ||
| Assigned To: | BEST SQUAD | Priority: B |
| 311 Reference Number: 1-1-1628745471 | ||
| Received: | 10/09/2018 | Block: 1158 | Lot: 133 | Community Board: 107 | ||
| Owner: | AMSTERDAM AVENUE REDEVELOPMENT | |||||
| Last Inspection: | 10/23/2018 - - BY BADGE # 2555 |
| Disposition: | 10/24/2018 - L2 - STOP WORK ORDER FULLY RESCINDED |
| Job Number: | 122887224 |
| Comments: | COMPLIED WITH SUMMONSES BY PROVIDING SIDEWALK SHED & SAFETY MEASURES FOR CRANE OPERATION AS REQUIRED |
| Prev DOB Violation #: | 101718CE07BG03/04 |
| Prev ECB Violation #: | 35366685X 35366686H |
| Complaint Disposition History |
| # | Disposition | Disposition | Inspection | Date | |
| Date | Code | By | |||
| 4 | 10/24/2018 | L2 | STOP WORK ORDER FULLY RESCINDED | 2555 | 10/23/2018 |
| COMPLIED WITH SUMMONSES BY PROVIDING SIDEWALK SHED & SAFETY MEASURES FOR CRANE OPERATION AS REQUIRED | |||||
| 3 | 10/18/2018 | A3 | FULL STOP WORK ORDER SERVED | 2555 | 10/17/2018 |
| FL/PROV SIDEWALK SHED & SAFETY MEASURES FOR CRANE/OPERA AS RQRD,STP/WRK EXCEPT TO PROV-SWS & SAFETY/MEASU F/CRANE OPERA | |||||
| 2 | 10/15/2018 | C1 | INSPECTOR UNABLE TO GAIN ACCESS - 1ST ATTEMPT | 2555 | 10/15/2018 |
| SITE CLOSED 1ST ATTEMPT | |||||
| 1 | 10/10/2018 | D4 | COMPLAINT ASSIGNED TO BEST SQUAD | 1795 | 10/10/2018 |
| REASSIGNED, NB # 122887224 | |||||