| NYC Department of Buildings | ||
| Overview for Complaint #:1409019 = RESOLVED | ||
| Complaint at: 50 ALLEN STREET | BIN: 1079023 | Borough: MANHATTAN | ZIP: 10002 | |||
| Re: COMPLAINT #1408336 ALLEGED CONSTRUCTION CONSISTING OF ELECTRICAL WORK,REMOVING WALL, WORK BEING DONE WITHOUT A PERMIT | ||||||
| Category Code: | 59 ELECTRICAL WIRING - DEFECTIVE/EXPOSED, IN PROGRESS | |
| Assigned To: | ELECTRICAL DIVISION | Priority: B |
| Received: | 10/20/2015 | Block: 308 | Lot: 22 | Community Board: 103 | ||
| Owner: | CHANG QING LLC | |||||
| Last Inspection: | 11/10/2015 - - BY BADGE # 1244 |
| Disposition: | 11/10/2015 - A8 - ECB VIOLATION SERVED |
| DOB Violation #: | 111015EE103RID05 |
| ECB Violation #: | 35159468H |
| Comments: | WWP FOR THE ENTIRE ENGINEERING OFFICE: SUB PANEL, BRANCH CIRCUITS WIRING, RECEPTACLES OUTLETS, SWITCHES, LIGHTING FIXTURES, (A/C) UNIT. THIS IS NOT A FINAL INSPECTION. SEE THIS COMPLAINT # 1409019. (LAM& LAM. ENGINEERING D.P.C KING'S U S A GROUP.) |
| Complaint Disposition History |
| # | Disposition | Disposition | Inspection | Date | |
| Date | Code | By | |||
| 2 | 11/10/2015 | A8 | ECB VIOLATION SERVED | 1244 | 11/10/2015 |
| WWP FOR THE ENTIRE ENGINEERING OFFICE: SUB PANEL, BRANCH CIRCUITS WIRING, RECEPTACLES OUTLETS, SWITCHES, LIGHTING FIXTURES, (A/C) UNIT. THIS IS NOT A FINAL INSPECTION. SEE THIS COMPLAINT # 1409019. (LAM& LAM. ENGINEERING D.P.C KING'S U S A GROUP.) | |||||
| 1 | 11/06/2015 | C1 | INSPECTOR UNABLE TO GAIN ACCESS - 1ST ATTEMPT | 1244 | 11/06/2015 |
| NO ACCESS. RING THE BELL NO ANSWER. (LAM& LAM) ENGINEERING D.P.C KING'S U S A GROUP. | |||||