![]() |
|
|
| NYC Department of Buildings | ||
| Overview for Complaint #:1234628 = RESOLVED | ||
| Complaint at: 11 BROADWAY | BIN: 1000044 | Borough: MANHATTAN | ZIP: 10004 | |||
| Re: CLR STS CONSTRUCTION WORK WAS DONE AT LOCATION ABOVE CONTRARY TO APPROVED PLAN. CLR STS THE VENTILATION SYSTEM AND CENTRAL AIR WAS CHANGED. CLR STS PLUMBING WORK WAS ALSO DONE AND CHANGED | ||||||
| Category Code: | 83 CONSTRUCTION - CONTRARY/BEYOND APPROVED PLANS/PERMITS | |
| Special District: | LM - LOWER MANHATTAN | |
| Assigned To: | MANHATTAN CONSTRUCTION ENFORCEMENT | Priority: B |
| Received: | 08/25/2008 15:56 | Block: 13 | Lot: 5 | Community Board: 101 | ||
| Owner: | BOWLING GREEN ASSOCIATES,L.P. | |||||
| Last Inspection: | 09/02/2008 - - BY BADGE # 2409 |
| Disposition: | 09/02/2008 - A9 - ECB & BUILDINGS VIOLATIONS SERVED |
| DOB Violation #: | 090208C01VP01 |
| ECB Violation #: | 34699135K |
| Comments: | FAILURE TO PROVIDE APPROVED PLANS AT TIME OF INSPECTION FOR HVAC WORK ON SECOND FLOOR |
| Complaint Disposition History |
| # | Disposition | Disposition | Inspection | Date | |
| Date | Code | By | |||