| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/09/2017 |
140704904 |
01 |
A2 |
P APPROVED |
11/17/2017 |
0072587 PE |
KHAN |
|
NOT APPLICABLE
|
|
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE
|
|
Work on Floor(s): 001 thru 006
|
| 09/21/2017 |
140698029 |
01 |
A2 |
H P/E IN PROCESS |
09/21/2017 |
0072587 PE |
KHAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/17/2017 FACADE RESTORATION WORK AS PER INDICATED ON PLAN.
|
|
Work on Floor(s): 001 thru 006
|
| 07/11/2017 |
140667115 |
01 |
A3 |
X SIGNED OFF |
11/23/2020 |
0072587 PE |
KHAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD (+/-) 268'-0" LONG AND 60'-0" HIGH ON GRADE,
|
|
Work on Floor(s): OSP
|
| 09/01/2016 |
140544105 |
01 |
A3 |
X SIGNED OFF |
11/08/2017 |
0090814 PE |
ELSAID |
|
NOT APPLICABLE
|
|
INSTALLATION OF APPROXIMATELY 45 LF OF TEMPORARY SIDEWALK SHED AS PER PLAN
|
|
Work on Floor(s): OSP
|
| 03/10/2006 |
104375784 |
01 |
A2 |
P APPROVED |
03/13/2006 |
0068368 PE |
GEANNAKA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/21/2010 PLUMBING WORK AS SHOWN ON THE PLANS. NO CHANGE I
|
|
Work on Floor(s): CEL
|