| 09/16/2020 |
340766184 |
01 |
A2 |
X SIGNED OFF |
02/02/2021 |
0089068 PE |
MAHANGU |
|
NOT APPLICABLE
|
|
INSTALL SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO USE, EGRESS
|
|
Work on Floor(s): CEL,ROF
|
| 05/25/2016 |
340384676 |
01 |
A3 |
P APPROVED |
05/26/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL
|
|
Work on Floor(s): OSP
|
| 05/25/2016 |
340384667 |
01 |
A3 |
R PERMIT-ENTIRE |
05/27/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|