| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/20/2025 |
121191263 |
17 |
NB |
P APPROVED |
05/01/2025 |
|
ZIGOMANI |
|
AMENDED 05/01/2025
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 08/22/2022 |
140582199 |
04 |
A2 |
P APPROVED |
09/20/2022 |
|
GERVASI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 11/04/2021 |
121191263 |
16 |
NB |
P APPROVED |
11/19/2021 |
0082938 PE |
GERVASI |
|
AMENDED 05/01/2025
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 07/26/2021 |
121191263 |
15 |
NB |
P APPROVED |
10/21/2021 |
0082938 PE |
GERVASI |
|
AMENDED 05/01/2025
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 07/09/2021 |
121191263 |
14 |
NB |
P APPROVED |
07/29/2021 |
|
ZIGOMANI |
|
AMENDED 05/01/2025
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 12/30/2020 |
140582199 |
03 |
A2 |
P APPROVED |
02/10/2021 |
0082938 PE |
GERVASI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 11/04/2020 |
140974578 |
01 |
A2 |
X SIGNED OFF |
06/06/2022 |
0038321 RA |
DEMETRY |
|
NOT APPLICABLE
|
|
INSTALL AUTOMATIC PARKING SYSTEM
|
|
Work on Floor(s): CEL,001,002,003,004
|
| 10/13/2020 |
121191263 |
13 |
NB |
P APPROVED |
11/10/2020 |
|
ZIGOMANI |
|
AMENDED 05/01/2025
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 07/24/2020 |
121191263 |
12 |
NB |
P APPROVED |
08/18/2020 |
|
ZIGOMANI |
|
AMENDED 05/01/2025
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 05/14/2020 |
122969252 |
03 |
A2 |
P APPROVED |
05/20/2020 |
0075303 PE |
GERVASI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DET
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 04/22/2020 |
121191263 |
11 |
NB |
P APPROVED |
04/29/2020 |
|
ZIGOMANI |
|
AMENDED 05/01/2025
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 04/16/2020 |
123865282 |
01 |
A2 |
X SIGNED OFF |
12/21/2021 |
0065403 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
INSTALL (2) NEW GAS FIRED FIREPLACES WITH SIDE WALL VENTED WITH INDUCERS A
|
|
Work on Floor(s): 001
|
| 03/19/2020 |
140892577 |
01 |
A3 |
X SIGNED OFF |
03/01/2021 |
0087583 PE |
HERNANDE |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT COURTYARD AS PER DRAWINGS
|
|
Work on Floor(s): OSP
|
| 01/08/2020 |
140882463 |
01 |
A3 |
P APPROVED |
01/22/2020 |
0087830 PE |
PUERTA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/12/2024 FILING HEREWITH TENANT PROTECTION PLAN AS PER PLA
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 12/10/2019 |
140814876 |
04 |
A3 |
P APPROVED |
12/13/2019 |
|
KETCHO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 12/10/2019 |
140814849 |
03 |
A3 |
P APPROVED |
12/13/2019 |
|
KETCHO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 12/05/2019 |
121191263 |
10 |
NB |
P APPROVED |
12/26/2019 |
0075303 PE |
PATTI |
|
AMENDED 05/01/2025
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 12/03/2019 |
140582199 |
02 |
A2 |
P APPROVED |
12/13/2019 |
|
PATTI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 11/20/2019 |
123792538 |
01 |
SC |
U COMPLETED |
12/18/2019 |
0033081 RA |
ZIGOMANI |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR CONDOMINIUM SUBDIVISION. TAX LOT 39 TO BE SUBDIVIDED
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 10/08/2019 |
122969252 |
02 |
A2 |
J P/E DISAPPROVED |
01/28/2020 |
0082938 PE |
GERVASI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 04/15/2020 INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 09/27/2019 |
123432909 |
02 |
A2 |
P APPROVED |
10/04/2019 |
0090169 PE |
CARPIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,CEL
|
| 09/18/2019 |
123745750 |
01 |
SC |
U COMPLETED |
09/19/2019 |
0033081 RA |
ZIGOMANI |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR CONDOMINIUM SUBDIVISION. TAX LOT 39 TO BE SUBDIVIDED
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 06/03/2019 |
140814876 |
03 |
A3 |
P APPROVED |
09/03/2019 |
0090169 PE |
CARPIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/03/2019 |
140814849 |
02 |
A3 |
P APPROVED |
09/06/2019 |
|
CARPIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 05/01/2019 |
140846164 |
01 |
A3 |
X SIGNED OFF |
03/01/2021 |
0087583 PE |
HERNANDE |
|
NOT APPLICABLE
|
|
INSTALLATION OF A TEMPORARY LOADING DOCK AND RAMP AS PER DRAWINGS. TEMPORA
|
|
Work on Floor(s): OSP
|
| 04/24/2019 |
140814876 |
02 |
A3 |
P APPROVED |
04/29/2019 |
0090169 PE |
CARPIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 02/13/2019 |
140794852 |
03 |
A3 |
P APPROVED |
03/08/2019 |
|
HERNANDE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 02/05/2019 |
121191263 |
09 |
NB |
P APPROVED |
03/01/2019 |
0075303 PE |
PATTI |
|
AMENDED 05/01/2025
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 01/09/2019 |
121191263 |
08 |
NB |
P APPROVED |
03/05/2019 |
|
ZIGOMANI |
|
AMENDED 05/01/2025
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 027
|
| 12/21/2018 |
140824106 |
01 |
A3 |
X SIGNED OFF |
03/01/2021 |
0087583 PE |
HERNANDE |
|
NOT APPLICABLE
|
|
535 GREENWICH ST: INSTALLATION OF TEMPORARY ROOF/OVERHEAD PROTECTION AT AD
|
|
Work on Floor(s): OSP
|
| 12/21/2018 |
140824099 |
01 |
A3 |
X SIGNED OFF |
03/01/2021 |
0087583 PE |
HERNANDE |
|
NOT APPLICABLE
|
|
104 CHARLTON ST: INSTALLATION OF TEMPORARY ROOF/OVERHEAD PROTECTION AT ADJ
|
|
Work on Floor(s): OSP
|
| 12/21/2018 |
140824080 |
01 |
A3 |
X SIGNED OFF |
03/01/2021 |
0087583 PE |
HERNANDE |
|
NOT APPLICABLE
|
|
95 VANDAM STREET: INSTALLATION OF TEMPORARY ROOF/OVERHEAD PROTECTION AT AD
|
|
Work on Floor(s): OSP
|
| 11/05/2018 |
123576362 |
01 |
A2 |
X SIGNED OFF |
11/20/2023 |
0080484 PE |
CHELLIAH |
|
NOT APPLICABLE
|
|
INSTALLATION OF A REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH A PAS
|
|
Work on Floor(s): CEL,ROF,BH 001 thru 027
|
| 10/29/2018 |
140814876 |
01 |
A3 |
X SIGNED OFF |
09/22/2020 |
0101795 PE |
KETCHO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. TEMPORARY PIPE SC
|
|
Work on Floor(s): OSP
|
| 10/29/2018 |
140814849 |
01 |
A3 |
X SIGNED OFF |
09/22/2020 |
0101795 PE |
KETCHO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. TEMPORARY
|
|
Work on Floor(s): OSP
|
| 09/21/2018 |
140805332 |
01 |
A3 |
X SIGNED OFF |
03/01/2021 |
0087583 PE |
HERNANDE |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY LOADING DOCK AS PER DRAWINGS. TEMPORARY LOADING
|
|
Work on Floor(s): OSP
|
| 09/20/2018 |
140794852 |
02 |
A3 |
P APPROVED |
09/27/2018 |
|
HERNANDE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/27/2018 |
140797038 |
01 |
A3 |
X SIGNED OFF |
03/01/2021 |
0087583 PE |
HERNANDE |
|
NOT APPLICABLE
|
|
INSTALLATION OF ROOF PROTECTION AT ADJACENT PROPERTY DURING NEW BLDG
|
|
Work on Floor(s): OSP
|
| 08/16/2018 |
140794852 |
01 |
A3 |
X SIGNED OFF |
03/01/2021 |
0087583 PE |
HERNANDE |
|
NOT APPLICABLE
|
|
INSTALLATION OF DUAL 7000 LBS CAPACITY PERSONAL/MATERIAL HOIST DURING NEW
|
|
Work on Floor(s): OSP
|
| 04/27/2018 |
123432909 |
01 |
A2 |
X SIGNED OFF |
10/25/2019 |
0090169 PE |
CARPIO |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR SUPPORT OF EXCAVATION AS PER PLANS FILED HEREWITH. NO
|
|
Work on Floor(s): OSP,CEL
|