BIS Menu  |  Marquee Query  |  Property Profile  |  Applications  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
NO MARQUEE RECORDS FOUND FOR THIS PROPERTY
Page: 1 of 2
Premises: 108 CHARLTON STREET MANHATTAN BIN: 1090661    Block: 597    Lot: 7503

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
03/20/2025 121191263 17 NB P APPROVED 05/01/2025 ZIGOMANI AMENDED 05/01/2025
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 027

08/22/2022 140582199 04 A2 P APPROVED 09/20/2022 GERVASI NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 027

11/04/2021 121191263 16 NB P APPROVED 11/19/2021 0082938 PE GERVASI AMENDED 05/01/2025
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): CEL,ROF 001 thru 027

07/26/2021 121191263 15 NB P APPROVED 10/21/2021 0082938 PE GERVASI AMENDED 05/01/2025
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): CEL,ROF 001 thru 027

07/09/2021 121191263 14 NB P APPROVED 07/29/2021 ZIGOMANI AMENDED 05/01/2025
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 027

12/30/2020 140582199 03 A2 P APPROVED 02/10/2021 0082938 PE GERVASI NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 027

11/04/2020 140974578 01 A2 X SIGNED OFF 06/06/2022 0038321 RA DEMETRY NOT APPLICABLE
 INSTALL AUTOMATIC PARKING SYSTEM
 Work on Floor(s): CEL,001,002,003,004

10/13/2020 121191263 13 NB P APPROVED 11/10/2020 ZIGOMANI AMENDED 05/01/2025
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 027

07/24/2020 121191263 12 NB P APPROVED 08/18/2020 ZIGOMANI AMENDED 05/01/2025
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 027

05/14/2020 122969252 03 A2 P APPROVED 05/20/2020 0075303 PE GERVASI NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DET
 Work on Floor(s): CEL,ROF 001 thru 027

04/22/2020 121191263 11 NB P APPROVED 04/29/2020 ZIGOMANI AMENDED 05/01/2025
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 027

04/16/2020 123865282 01 A2 X SIGNED OFF 12/21/2021 0065403 PE GERMAIN NOT APPLICABLE
 INSTALL (2) NEW GAS FIRED FIREPLACES WITH SIDE WALL VENTED WITH INDUCERS A
 Work on Floor(s): 001

03/19/2020 140892577 01 A3 X SIGNED OFF 03/01/2021 0087583 PE HERNANDE NOT APPLICABLE
 INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT COURTYARD AS PER DRAWINGS
 Work on Floor(s): OSP

01/08/2020 140882463 01 A3 P APPROVED 01/22/2020 0087830 PE PUERTA NOT APPLICABLE
 JOB WITHDRAWN 11/12/2024 FILING HEREWITH TENANT PROTECTION PLAN AS PER PLA
 Work on Floor(s): CEL,ROF 001 thru 027

12/10/2019 140814876 04 A3 P APPROVED 12/13/2019 KETCHO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

12/10/2019 140814849 03 A3 P APPROVED 12/13/2019 KETCHO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

12/05/2019 121191263 10 NB P APPROVED 12/26/2019 0075303 PE PATTI AMENDED 05/01/2025
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): CEL,ROF 001 thru 027

12/03/2019 140582199 02 A2 P APPROVED 12/13/2019 PATTI NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 027

11/20/2019 123792538 01 SC U COMPLETED 12/18/2019 0033081 RA ZIGOMANI NOT APPLICABLE
 APPLICATION FILED FOR CONDOMINIUM SUBDIVISION. TAX LOT 39 TO BE SUBDIVIDED
 Work on Floor(s): CEL,ROF 001 thru 027

10/08/2019 122969252 02 A2 J P/E DISAPPROVED 01/28/2020 0082938 PE GERVASI NOT APPLICABLE
 DOC WITHDRAWN 04/15/2020 INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION
 Work on Floor(s): CEL,ROF 001 thru 027

09/27/2019 123432909 02 A2 P APPROVED 10/04/2019 0090169 PE CARPIO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP,CEL

09/18/2019 123745750 01 SC U COMPLETED 09/19/2019 0033081 RA ZIGOMANI NOT APPLICABLE
 APPLICATION FILED FOR CONDOMINIUM SUBDIVISION. TAX LOT 39 TO BE SUBDIVIDED
 Work on Floor(s): CEL,ROF 001 thru 027

06/03/2019 140814876 03 A3 P APPROVED 09/03/2019 0090169 PE CARPIO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

06/03/2019 140814849 02 A3 P APPROVED 09/06/2019 CARPIO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

05/01/2019 140846164 01 A3 X SIGNED OFF 03/01/2021 0087583 PE HERNANDE NOT APPLICABLE
 INSTALLATION OF A TEMPORARY LOADING DOCK AND RAMP AS PER DRAWINGS. TEMPORA
 Work on Floor(s): OSP

04/24/2019 140814876 02 A3 P APPROVED 04/29/2019 0090169 PE CARPIO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

02/13/2019 140794852 03 A3 P APPROVED 03/08/2019 HERNANDE NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

02/05/2019 121191263 09 NB P APPROVED 03/01/2019 0075303 PE PATTI AMENDED 05/01/2025
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): CEL,ROF 001 thru 027

01/09/2019 121191263 08 NB P APPROVED 03/05/2019 ZIGOMANI AMENDED 05/01/2025
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 027

12/21/2018 140824106 01 A3 X SIGNED OFF 03/01/2021 0087583 PE HERNANDE NOT APPLICABLE
 535 GREENWICH ST: INSTALLATION OF TEMPORARY ROOF/OVERHEAD PROTECTION AT AD
 Work on Floor(s): OSP

12/21/2018 140824099 01 A3 X SIGNED OFF 03/01/2021 0087583 PE HERNANDE NOT APPLICABLE
 104 CHARLTON ST: INSTALLATION OF TEMPORARY ROOF/OVERHEAD PROTECTION AT ADJ
 Work on Floor(s): OSP

12/21/2018 140824080 01 A3 X SIGNED OFF 03/01/2021 0087583 PE HERNANDE NOT APPLICABLE
 95 VANDAM STREET: INSTALLATION OF TEMPORARY ROOF/OVERHEAD PROTECTION AT AD
 Work on Floor(s): OSP

11/05/2018 123576362 01 A2 X SIGNED OFF 11/20/2023 0080484 PE CHELLIAH NOT APPLICABLE
 INSTALLATION OF A REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH A PAS
 Work on Floor(s): CEL,ROF,BH 001 thru 027

10/29/2018 140814876 01 A3 X SIGNED OFF 09/22/2020 0101795 PE KETCHO NOT APPLICABLE
 INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. TEMPORARY PIPE SC
 Work on Floor(s): OSP

10/29/2018 140814849 01 A3 X SIGNED OFF 09/22/2020 0101795 PE KETCHO NOT APPLICABLE
 INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. TEMPORARY
 Work on Floor(s): OSP

09/21/2018 140805332 01 A3 X SIGNED OFF 03/01/2021 0087583 PE HERNANDE NOT APPLICABLE
 INSTALLATION OF TEMPORARY LOADING DOCK AS PER DRAWINGS. TEMPORARY LOADING
 Work on Floor(s): OSP

09/20/2018 140794852 02 A3 P APPROVED 09/27/2018 HERNANDE NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

08/27/2018 140797038 01 A3 X SIGNED OFF 03/01/2021 0087583 PE HERNANDE NOT APPLICABLE
 INSTALLATION OF ROOF PROTECTION AT ADJACENT PROPERTY DURING NEW BLDG
 Work on Floor(s): OSP

08/16/2018 140794852 01 A3 X SIGNED OFF 03/01/2021 0087583 PE HERNANDE NOT APPLICABLE
 INSTALLATION OF DUAL 7000 LBS CAPACITY PERSONAL/MATERIAL HOIST DURING NEW
 Work on Floor(s): OSP

04/27/2018 123432909 01 A2 X SIGNED OFF 10/25/2019 0090169 PE CARPIO NOT APPLICABLE
 HEREWITH FILING FOR SUPPORT OF EXCAVATION AS PER PLANS FILED HEREWITH. NO
 Work on Floor(s): OSP,CEL