Disposition |
Disposition |
Inspection |
Date |
|
Date |
Code |
By |
|
| 4 |
09/29/2023 |
L2 |
STOP WORK ORDER FULLY RESCINDED |
3169 |
09/29/2023 |
| |
|
|
AT TIME OF INSPECTION SITE CONFORMS TO PERMITTED JOB #123914023 FOR FULL DEMOLITION AND WAS SIGNED OFF ON 8/24/2023. |
|
| 3 |
09/25/2023 |
L1 |
PARTIAL STOP WORK ORDER |
3169 |
09/25/2023 |
| |
|
|
AT TIME OF INSPECTION NO PLANS ON SITE. UNABLE TO RESCIND PSWO |
|
| 2 |
08/25/2023 |
Y5 |
STOP WORK REINSPECTION FAILURE |
3073 |
08/25/2023 |
| |
|
|
APPOINTMENT WAS CANCELED |
|
| 1 |
04/24/2023 |
L1 |
PARTIAL STOP WORK ORDER |
2617 |
04/23/2023 |
| |
|
|
L-1 - PARTIAL COLLAPSE TO THE 3RD FLOOR REAR ONTO 2ND, 1ST AND INTO THE BASEMENT DUE TO RAIN COLLECTION VIA OPEN ROOF - PREMISES IS UNDER ASBESTOS ABATEMENT AT THE ROOF LEVEL ELIMINATING THE ROOF PROTECTON - FAILURE TO INSTITUTE SAFETY MEASURE TO PREVENT WATER COLLECTION AND PARTIAL COLLAPSE - OWNER MUST ALSO PROVIDE AN ENGINEER'S REPORT AND MEANS / METHODS FOR SAFE OPERATION. |
|