BIS Menu  |  Application Data   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Application Details
The below information does not include work types submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
Premises: 280 MULBERRY STREET MANHATTAN Job No: 101606086
BIN: 1007916    Block: 509    Lot: 14 Document: 01 OF 1
Job Type: A2 - ALTERATION TYPE 2
Document Overview    Items Required    Virtual Job Folder    All Permits         Schedule B
Fees Paid    Forms Received       All Comments         Plumbing Inspections
Crane Information    Plan Examination                Print Letter of Completion
After Hours Variance Permits            
This job is not subject to the Department's Development Challenge Process. For any issues, please contact the relevant borough office.

Last Action: SIGNED OFF 02/20/1998 (X)
Application approved on: 08/06/1997
 
Pre-Filed: 07/29/1997 Building Type: Other Estimated Total Cost: $60,000.00
Date Filed: 08/01/1997     Electronically Filed: No
Fee Structure: STANDARD
Review is requested under Building Code: Prior-to-1968
Job Description    Comments
1  Location Information (Filed At)
House No(s): 280 Street Name: MULBERRY STREET
Borough: Manhattan Block: 509 Lot: 14 BIN: 1007916 CB No: 102
Work on Floor(s): 007,008,009 007 thru 009 Apt/Condo No(s): Zip Code: 10012
2  Applicant of Record Information
Name: GEORGE RYCAR
Business Name: GEORGE RYCAR ARCHITECT P.C Business Phone: 212-888-9649
Business Address: 220 EAST 63RD STREET NEW YORK NY 10021 Business Fax:
E-Mail: Mobile Telephone:
License Number: 012965
Applicant Type: P.E.   R.A   Sign Hanger   R.L.A.   Other  
    Directive 14 Applicant
Name: GEORGE RYCAR
Business Name: GEORGE RYCAR ARCHITECT P.C Business Phone:
Business Address: Business Fax:
E-Mail: Mobile Telephone:
Applicant Type: RA License Number: 012965
    Previous Applicant of Record
    Not Applicable
3  Filing Representative
    None
4  Filing Status
    Click Here to View
5  Job Types
Alteration Type 1 or Alteration Type 1 required to meet New Building requirements (28-101.4.5)
Alteration Type 1, OT "No Work" New Building
Alteration Type 2 Full Demolition
Alteration Type 3 Subdivision: Improved
Sign Subdivision: Condo
Directive 14 acceptance requested?    Yes        No
6   Work Types
BL - Boiler FA - Fire Alarm FB - Fuel Burning FS - Fuel Storage
FP - Fire Suppression MH - Mechanical PL - Plumbing SD - Standpipe
SP - Sprinkler EQ - Construction Equipment CC - Curb Cut
OT -  GEN CONST
7   Plans/Construction Documents Submitted
     Plans Page Count:  Not Provided
8  Additional Information
Enlargement proposed?
     No        Yes      Horizontal      Vertical
9  Additional Considerations, Limitations or Restrictions
Yes No Yes No
Alt. required to meet New Building req's (28-101.4.5) Alteration is a major change to exits
Change in number of dwelling units
Change in Occupancy / Use
Change is inconsistent with current certificate of occupancy
Change in number of stories

Facade Alteration Infill Zoning
Adult Establishment Loft Board
Compensated Development (Inclusionary Housing) Quality Housing
Low Income Housing (Inclusionary Housing) Site Safety Job / Project
Single Room Occupancy (SRO) Multiple Dwelling Included in LMCCC
Filing includes Lot Merger / Reapportionment Work Includes:
Prefab wood I-joists
Structural cold-formed steel
Open-web steel joists

Landmark
Environmental Restrictions (Little E or RD)
Unmapped/CCO Street
Legalization
Other, Specify:  
Filed to Comply with Local Law
Restrictive Declaration / Easement
Zoning Exhibit Record (I,II,III,etc)
Filed to Address Violation(s)

Work includes lighting fixture and/or controls, installation or replacement. [ECC §404 and §505]
Work includes modular construction under New York State jurisdiction
Work includes modular construction under New York City jurisdiction
Structural peer review required per BC §1627 Peer Reviewer License No.(P.E.):  
Work includes permanent removal of standpipe, sprinkler or fire suppression related systems
Work includes partial demolition as defined in AC §28-101.5, or the raising/moving of a building
Structural Stability affected by proposed work
BSA Calendar No.(s):
CPC Calendar No.(s):
10  NYCECC Compliance New York City Energy Conservation Code  (Applicant Statement)
      Not Provided
11  Job Description
PARTITION AND PLUMBING WORK IN EXISTING APARTMENTS. ALL AS PER PLANS AND
APPLICATIONS FILED HEREWITH. THERE IS NO CHANGE IN USE, OCCUPANCY, MEANS OF EGRESS OR ROOM COUNT.
Related BIS Job Numbers:  
Primary application Job Number:  
12  Zoning Characteristics
District(s):   C6-2 - GENERAL CENTRAL COMMERCIAL DISTRICT    
Overlay(s):  
Special District(s):  
Map No.:  12C Street legal width (ft.):   Street status:     Public         Private    
Zoning lot includes the following tax lots:   Not Provided
13  Building Characteristics
2022/2014/2008 Code Designations?
Occupancy Classification: Existing:        Yes     No
Proposed:        Yes     No
Construction Classification: Existing:        Yes     No
Proposed:        Yes     No
Multiple Dwelling Classification: Existing:     
Proposed:     
Building Height (ft.): Existing:     
Proposed:     60
Building Stories: Existing:     
Proposed:     6
Dwelling Units: Existing:    
Proposed:     33
Mixed use building?         Yes        No   
14  Fill
Not Applicable Off-Site On-Site Under 300 cubic yards
15  Construction Equipment
      Not Applicable
16  Curb Cut Description
       Not Applicable
17  Tax Lot Characteristics
       Not Provided
18  Fire Protection Equipment
      Not Applicable
19  Open Spaces
      Not Provided
20  Site Characteristics
      Not Provided
21  Demolition Details
      Not Applicable
22  Asbestos Abatement Compliance
23  Signs
      Not Applicable
24  Comments
25  Applicant's Statements and Signatures     ( See paper form or check Forms Received )
Yes No
For New Building and Alteration 1 applications filed under the 2008 or 2014 NYC Building Code only: does this building qualify for high-rise designation?
Directive 14 applications only: I certify that the construction documents submitted and all construction documents related to this application do not require a new or amended Certificate of Occupancy as there is no change in use, exits, or occupancy.
26  Owner's Information
Name: STEVEN CROMAN
Relationship to Owner: MANAGING AGENT
Business Name: CROMAN REAL ESTATE Business Phone:
Business Address: Business Fax:
E-Mail: Owner Type: CORPORATION
Non Profit:    Yes        No
Yes No
Owner's Certification Regarding Occupied Housing (Remain Occupied)
Owner's Certification Regarding Occupied Housing (Rent Control / Stabilization)
Owner DHCR Notification
Owner's Certification for Adult Establishment
Owner's Certification for Directive 14 (if applicable)
      Condo / Co-Op or Corporation Second Officer
Name: HARRIET CROMAN Title: VICE PRESI
Business Name: CROMAN REAL ESTATE Business Phone:
Business Address: Business Fax:
E-Mail:

      Metes and Bounds
  Beginning at a point on the      side of   
  Distant      ft.      of the corner formed by the intersection of    and   
Running Thence: 0 ft. Thence: 0 ft.
Running Thence: 0 ft. Thence: 0 ft.
Running Thence: 0 ft. Thence: 0 ft.
Running Thence: 0 ft. Thence: 0 ft.



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Application Data