 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/08/2025 |
500875859 |
02 |
A2 |
P APPROVED |
04/08/2025 |
|
KATS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 004
|
| 04/01/2022 |
500877009 |
01 |
A3 |
R PERMIT-ENTIRE |
04/01/2022 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
LIMITED BPP FILED HEREIN
|
|
Work on Floor(s): OSP
|
| 01/18/2022 |
500875047 |
12 |
NB |
P APPROVED |
01/18/2022 |
|
SALIB |
|
GRANTED 01/07/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 004
|
| 08/04/2021 |
500875047 |
11 |
NB |
P APPROVED |
08/04/2021 |
0089624 PE |
CARAVELL |
|
GRANTED 01/07/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): OSP
|
| 05/20/2021 |
500876876 |
01 |
A2 |
X SIGNED OFF |
05/31/2022 |
0069932 PE |
CUNNINGH |
|
NOT APPLICABLE
|
|
PROPOSED SOE FOR CATCH BASINS, RETAINING WALL FOOTINGS, & CONED VAULT. ALL
|
|
Work on Floor(s): OSP
|
| 03/08/2021 |
500877143 |
01 |
A2 |
X SIGNED OFF |
05/31/2022 |
0069932 PE |
CUNNINGH |
|
NOT APPLICABLE
|
|
PROPOSED SOE FOR VAULT IN CONJUNCTION WITH NEW BUILDING. ALL AS PER PLANS
|
|
Work on Floor(s): OSP
|
| 01/24/2020 |
500876064 |
02 |
A2 |
X SIGNED OFF |
03/21/2023 |
0075087 PE |
KATS |
|
NOT APPLICABLE
|
|
INTEGRAL FUEL STORAGE FOR SELF CONTAINED GENERATOR
|
|
Work on Floor(s): OSP
|
| 10/29/2019 |
500876386 |
01 |
A2 |
X SIGNED OFF |
05/31/2022 |
0069932 PE |
CUNNINGH |
|
NOT APPLICABLE
|
|
SOE/HS86R - FILING ON BEHALF OF CONTRACTOR FOR INSTALLATION OF TEMPORARY S
|
|
Work on Floor(s): OSP
|
| 10/28/2019 |
500876377 |
01 |
A2 |
X SIGNED OFF |
06/23/2022 |
0069932 PE |
CUNNINGH |
|
NOT APPLICABLE
|
|
SOU/HS86R - FILING ON BEHALF OF CONTRACTOR FOR INSTALLATION OF TEMPORARY S
|
|
Work on Floor(s): OSP
|
| 10/28/2019 |
500876359 |
01 |
A2 |
X SIGNED OFF |
05/31/2022 |
0069932 PE |
CUNNINGH |
|
NOT APPLICABLE
|
|
SOD/HS86R - FILING ON BEHALF OF CONTRACTOR FOR INSTALLATION OF TEMPORARY S
|
|
Work on Floor(s): OSP
|
| 08/27/2019 |
500875047 |
10 |
NB |
P APPROVED |
08/27/2019 |
0071333 PE |
QURESHI |
|
GRANTED 01/07/2019
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): ROF 001 thru 004
|
| 07/17/2019 |
500876126 |
01 |
A3 |
X SIGNED OFF |
12/08/2023 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
FN/HS86R - FOR TEMPORARY CONSTRUCTION EQUIPMENT (FENCE) SUBMITTING ON BEHA
|
|
Work on Floor(s): OSP
|
| 06/25/2019 |
500876064 |
01 |
A2 |
X SIGNED OFF |
03/21/2023 |
0075087 PE |
KATS |
|
NOT APPLICABLE
|
|
INSTALLATION OF EMERGENCY GENERATOR FOR IS/HS 86 R
|
|
Work on Floor(s): OSP
|
| 05/17/2019 |
500875868 |
01 |
A3 |
X SIGNED OFF |
10/02/2025 |
0032590 RA |
SALIB |
|
NOT APPLICABLE
|
|
FIRE PROTECTION PLAN FILED HEREIN
|
|
Work on Floor(s): ROF 001 thru 004
|
| 05/17/2019 |
500875859 |
01 |
A2 |
X SIGNED OFF |
01/09/2026 |
0075087 PE |
KATS |
|
NOT APPLICABLE
|
|
MANUAL, AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER ALARM WITH PRE-SIG
|
|
Work on Floor(s): ROF 001 thru 004
|
| 01/03/2019 |
500875047 |
09 |
NB |
R PERMIT-ENTIRE |
11/01/2019 |
0075087 PE |
KATS |
|
GRANTED 01/07/2019
|
|
UNDERGROUND PLUMBING FILED HEREIN
|
|
Work on Floor(s): UNG
|
| 01/03/2019 |
500875047 |
08 |
NB |
R PERMIT-ENTIRE |
11/01/2019 |
0062959 PE |
MC NAMAR |
|
GRANTED 01/07/2019
|
|
SUBMITTED HEREIN IS THE ENERGY ANALYSIS FOR THE NEW BUILDING 86 R
|
|
Work on Floor(s): ROF 001 thru 004
|
| 01/03/2019 |
500875047 |
07 |
NB |
R PERMIT-ENTIRE |
11/01/2019 |
0089491 PE |
HAYES |
|
GRANTED 01/07/2019
|
|
FILED HEREIN IS THE SUB-SLAB DEPRESSURIZATION SYSTEM
|
|
Work on Floor(s): OSP
|
| 01/03/2019 |
500875047 |
06 |
NB |
R PERMIT-ENTIRE |
11/01/2019 |
0075087 PE |
KATS |
|
GRANTED 01/07/2019
|
|
INSTALLATION OF BOILER FOR IS/HS 86 R
|
|
Work on Floor(s): ROF
|
| 01/03/2019 |
500875047 |
05 |
NB |
R PERMIT-ENTIRE |
11/01/2019 |
0071333 PE |
QURESHI |
|
GRANTED 01/07/2019
|
|
SPRINKLER AND STANDPIPE INSTALLATION FOR IS/HS 86 R
|
|
Work on Floor(s): ROF 001 thru 004
|
| 01/03/2019 |
500875047 |
04 |
NB |
R PERMIT-ENTIRE |
12/11/2019 |
0075087 PE |
KATS |
|
GRANTED 01/07/2019
|
|
PLUMBING AND MECHANICAL AND ELECTRICAL FOR NEW BUILDING IS/HS 86 R
|
|
Work on Floor(s): ROF,OSP 001 thru 004
|
| 01/03/2019 |
500875047 |
03 |
NB |
R PERMIT-ENTIRE |
11/01/2019 |
0063672 PE |
BACAS |
|
GRANTED 01/07/2019
|
|
STRUCTURAL FILING FOR NEW BUILDING IS/HS 86 R
|
|
Work on Floor(s): ROF 001 thru 004
|
| 01/03/2019 |
500875047 |
02 |
NB |
R PERMIT-ENTIRE |
12/11/2019 |
0089624 PE |
CARAVELL |
|
GRANTED 01/07/2019
|
|
SITE CIVIL PORTION FOR NEW BUILDING
|
|
Work on Floor(s): OSP
|
| 12/06/2018 |
500875047 |
01 |
NB |
R PERMIT-ENTIRE |
12/28/2023 |
0032590 RA |
SALIB |
|
GRANTED 01/07/2019
|
|
NEW BUILDING CONSTRUCTION FOR IS/HS 86 R
|
|
Work on Floor(s): ROF 001 thru 004
|
| 12/06/2018 |
500875421 |
01 |
PA |
U COMPLETED |
08/23/2022 |
0032590 RA |
SALIB |
|
NOT APPLICABLE
|
|
Work on Floor(s): 002
|
| 12/06/2018 |
500875430 |
01 |
PA |
U COMPLETED |
08/25/2022 |
0032590 RA |
SALIB |
|
NOT APPLICABLE
|
|
Work on Floor(s): 001
|