 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/26/2024 |
500876224 |
05 |
A2 |
P APPROVED |
06/26/2024 |
|
SHENOY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001
|
| 06/03/2024 |
500876224 |
04 |
A2 |
P APPROVED |
06/03/2024 |
|
GIACALON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REMOVAL OF FLOORING AND VINYL BASE, CEILING
|
|
Work on Floor(s): 001
|
| 08/07/2023 |
500876714 |
07 |
A2 |
P APPROVED |
08/07/2023 |
|
CACOSSA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001,002
|
| 08/07/2023 |
500876714 |
06 |
A2 |
P APPROVED |
08/07/2023 |
|
MARGOLIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 06/29/2023 |
500876224 |
03 |
A2 |
P APPROVED |
06/29/2023 |
|
GIACALON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 04/11/2022 |
500876796 |
03 |
A2 |
P APPROVED |
04/11/2022 |
|
MCNAMARA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REMOVAL OF ASPHALT PAVEMENT. CONSTRUCTION O
|
|
Work on Floor(s): 001
|
| 12/16/2021 |
500877170 |
01 |
A1 |
F ASSIGNED TO P/E |
12/16/2021 |
0032590 RA |
SALIB |
|
NOT APPLICABLE
|
|
NO WORK ALTERATION TYPE 1 FILED TO INDICATE ONLY THE PROPOSED NUMBER OF PA
|
|
Work on Floor(s): BAS,OSP 001 thru 003
|
| 10/20/2021 |
500876714 |
05 |
A2 |
P APPROVED |
10/20/2021 |
|
MARGOLIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 08/17/2021 |
500876714 |
04 |
A2 |
P APPROVED |
08/17/2021 |
|
MARGOLIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,002
|
| 12/04/2020 |
500876796 |
02 |
A2 |
P APPROVED |
12/04/2020 |
0062959 PE |
MCNAMARA |
|
NOT APPLICABLE
|
|
NEW TRENCH DRAIN AT THE BASE OF RAMP LOCATED OUTSIDE OF EXIT C1. CONNECTI
|
|
Work on Floor(s): 001
|
| 05/13/2020 |
500876714 |
03 |
A2 |
X SIGNED OFF |
06/24/2024 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
EXCAVATION FOR THE INSTALLATION OF FOUNDATION DRAIN.
|
|
Work on Floor(s): 001,002
|
| 05/13/2020 |
500876714 |
02 |
A2 |
X SIGNED OFF |
06/24/2024 |
0079633 PE |
CACOSSA |
|
NOT APPLICABLE
|
|
REPLACING EXISTING TRENCH DRAINS.
|
|
Work on Floor(s): 001,002
|
| 05/07/2020 |
500876796 |
01 |
A2 |
P APPROVED |
12/04/2020 |
0062959 PE |
MCNAMARA |
|
NOT APPLICABLE
|
|
REMOVAL OF ASPHALT PAVEMENT. CONSTRUCTION OF NEW CONCRETE RAMP AND CURB RA
|
|
Work on Floor(s): 001
|
| 04/13/2020 |
500876714 |
01 |
A2 |
X SIGNED OFF |
06/24/2024 |
0037479 RA |
MARGOLIN |
|
NOT APPLICABLE
|
|
WATER PROOFING OF THE FOUNDATION AND INSTALLATION OF FOOTING DRAINS, REPLA
|
|
Work on Floor(s): CEL,001
|
| 10/21/2019 |
500870970 |
03 |
A2 |
P APPROVED |
10/21/2019 |
|
SEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 09/30/2019 |
500876224 |
02 |
A2 |
R PERMIT-ENTIRE |
02/06/2020 |
0055232 PE |
SHENOY |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE EXISTING STEAM UNIT VENTILATORS. REMOVE AND REPLACE EXI
|
|
Work on Floor(s): 001
|
| 09/30/2019 |
500876224 |
01 |
A2 |
R PERMIT-ENTIRE |
09/11/2026 |
0020363 RA |
GIACALON |
|
NOT APPLICABLE
|
|
REMOVAL OF FLOORING AND VINYL BASE, CEILING TILES, ACOUSTICAL WALL PANELS,
|
|
Work on Floor(s): 001
|
| 08/01/2019 |
500876037 |
02 |
A2 |
P APPROVED |
08/01/2019 |
|
CARAVELL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REMOVE EXISTING PAVEMENT, CURB, LIGHT POLES
|
|
Work on Floor(s): OSP
|
| 06/18/2019 |
500876037 |
01 |
A2 |
R PERMIT-ENTIRE |
06/22/2022 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
REMOVE EXISTING PAVEMENT, CURB, LIGHT POLES, LANDSCAPING, TREES ELECTRIC L
|
|
Work on Floor(s): OSP
|
| 06/18/2019 |
540165569 |
01 |
A2 |
P APPROVED |
07/01/2019 |
0062959 PE |
MCNAMARA |
Y |
NOT APPLICABLE
|
|
REMOVAL OF ASPHALT PAVEMENT. CONSTRUCTION OF NEW CONCRETE RAMP AND CURB CU
|
|
Work on Floor(s): 001
|
| 04/11/2019 |
540163311 |
01 |
A2 |
H P/E IN PROCESS |
04/11/2019 |
0062959 PE |
MCNAMARA |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 06/10/2019 REMOVAL OF ASPHALT PAVEMENT. CONSTRUCTION OF NEW
|
|
Work on Floor(s): 001
|
| 11/14/2018 |
500875261 |
01 |
SI |
U COMPLETED |
11/14/2018 |
0032590 RA |
SALIB |
|
NOT APPLICABLE
|
|
APPORTION LOT 1 AND CREATE LOT 320
|
| 03/21/2018 |
500870970 |
02 |
A2 |
X SIGNED OFF |
04/20/2023 |
0070700 PE |
SHAH |
|
NOT APPLICABLE
|
|
LIGHTING WORK IN CONNECTION WITH GYMNASIUM UPGRADE. NO CHANGE IN ZONING,
|
|
Work on Floor(s): 001
|
| 03/21/2018 |
500870970 |
01 |
A2 |
X SIGNED OFF |
04/20/2023 |
0016053 RA |
SEN |
|
NOT APPLICABLE
|
|
GYMNASIUM UPGRADE. REPLACEMENT OF WOOD FLOORING, BLEACHERS AND LOCKERS.NO
|
|
Work on Floor(s): 001
|
| 02/12/2018 |
540142969 |
01 |
A2 |
D A/P ENTIRE |
02/12/2018 |
0016053 RA |
SEN |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 04/13/2018 GYMNASIUM UPGRADE. REPLACEMENT OF WOOD FLOORING, B
|
|
Work on Floor(s): 001
|
| 03/07/2017 |
500872148 |
04 |
A2 |
P APPROVED |
03/07/2017 |
0091224 RA |
MOHAMED |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): OSP,UDG,001
|
| 03/23/2016 |
500871372 |
04 |
A2 |
P APPROVED |
03/23/2016 |
|
RYSZKIEW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PS880R: FILED HEREWITH MINOR AUDITORIUM REN
|
|
Work on Floor(s): 001
|
| 12/18/2015 |
500873673 |
05 |
A2 |
P APPROVED |
12/18/2015 |
|
UTSCHIG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 11/27/2015 |
500872148 |
03 |
A2 |
P APPROVED |
11/27/2015 |
|
RYSZKIEW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PS 80- REPLACEMENT OF METAL CEILING IN KITC
|
|
Work on Floor(s): OSP,UDG,001
|
| 11/16/2015 |
500871924 |
04 |
A2 |
P APPROVED |
11/16/2015 |
|
SAMY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): UDG,OSP,001
|
| 10/02/2015 |
500872148 |
02 |
A2 |
X SIGNED OFF |
03/21/2019 |
0091224 RA |
MOHAMED |
|
NOT APPLICABLE
|
|
REMOVE EXISTING LIGHTING FIXTURES & REPLACE WITH NEW FIXTURES.
|
|
Work on Floor(s): OSP,UDG,001
|
| 10/02/2015 |
500872148 |
01 |
A2 |
X SIGNED OFF |
03/21/2019 |
0022723 RA |
RYSZKIEW |
|
NOT APPLICABLE
|
|
PS 80- REPLACEMENT OF METAL CEILING IN KITCHEN CORRIDOR,EXCAVATION FOR GAS
|
|
Work on Floor(s): OSP,UDG,001
|
| 09/28/2015 |
500871372 |
03 |
A2 |
P APPROVED |
09/28/2015 |
|
RYSZKIEW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 08/27/2015 |
500871924 |
03 |
A2 |
P APPROVED |
08/27/2015 |
|
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,UDG
|
| 08/25/2015 |
500871924 |
02 |
A2 |
P APPROVED |
08/25/2015 |
|
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REPLACE EXISTING GAS PIPING AS PER PLAN.
|
|
Work on Floor(s): OSP,UDG
|
| 07/06/2015 |
500871924 |
01 |
A2 |
X SIGNED OFF |
03/21/2019 |
0067900 PE |
SAMY |
|
NOT APPLICABLE
|
|
REPLACE EXISTING GAS PIPING AS PER PLAN.
|
|
Work on Floor(s): UDG,OSP,001
|
| 11/03/2014 |
540063731 |
01 |
A2 |
R PERMIT-ENTIRE |
05/12/2015 |
0064032 PE |
TAI |
|
NOT APPLICABLE
|
|
PROVIDE NEW BACKUP 20 TON AIR-CONDITIONING UNIT. NO CHANGE IN USE, EXISTS
|
|
Work on Floor(s): 001 thru 002
|
| 10/03/2014 |
500873673 |
04 |
A2 |
P APPROVED |
10/03/2014 |
|
UTSCHIG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/07/2014 |
500871372 |
01 |
A2 |
X SIGNED OFF |
05/03/2016 |
0022723 RA |
RYSZKIEW |
|
NOT APPLICABLE
|
|
PS880R: FILED HEREWITH MINOR AUDITORIUM RENOVATION WORK (FINISHES) INCLUDI
|
|
Work on Floor(s): 001
|
| 08/07/2014 |
500871372 |
02 |
A2 |
X SIGNED OFF |
05/03/2016 |
0068137 PE |
WALKER |
|
NOT APPLICABLE
|
|
PS880R: FILED HEREWITH PLANS FOR AUDITORIUM STAGE RIGGING, GRID, PROJECTIO
|
|
Work on Floor(s): 001
|