BIS Menu  |  Applications   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
 
Page: 1 of 1
Premises: 41-41 24 STREET QUEENS BIN: 4625890    Block: 414    Lot: 12

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
02/18/2026 420656374 09 NB D A/P ENTIRE 03/11/2026 MAKOOI GRANTED 09/23/2016
 POST APPROVAL AMENDMENT FOR 01 PROPOSED THIRTEEN (13) STORY RESIDENTIAL DE
 Work on Floor(s): CEL,ROF 001 thru 013

02/05/2026 420656374 08 NB D A/P ENTIRE 02/05/2026 0071681 PE TUCCI GRANTED 09/23/2016
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): CEL,ROF 001 thru 013

01/08/2026 420656374 07 NB P APPROVED 01/15/2026 0063868 PE NAJARIAN GRANTED 09/23/2016
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): CEL,ROF 001 thru 013

12/18/2025 420656374 06 NB P APPROVED 02/09/2026 0090818 PE DELIMITR GRANTED 09/23/2016
 POST APPROVAL AMENDMENT FOR 04
 Work on Floor(s): CEL,ROF 001 thru 013

06/11/2025 420656374 05 NB P APPROVED 01/29/2026 MAKOOI GRANTED 09/23/2016
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 013

08/29/2016 420656374 04 NB R PERMIT-ENTIRE 09/23/2025 0090818 PE DELIMITR GRANTED 09/23/2016
 SOE APPLICATION FILED IN CONJUNCTION WITH NB JOB NUMBER 420656374.
 Work on Floor(s): CEL,ROF 001 thru 013

07/28/2016 421354171 01 A2 J P/E DISAPPROVED 08/19/2016 0071681 PE TUCCI NOT APPLICABLE
 INSTALLATION OF AUTOMATIC/SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM
 Work on Floor(s): CEL,ROF 001 thru 013

06/07/2016 440314054 01 A3 R PERMIT-ENTIRE 04/10/2026 0034686 PE MAKOOI NOT APPLICABLE
 BPP FILED IN CONJUNCTION WITH NB JOB NUMBER 420656374
 Work on Floor(s): OSP

05/17/2016 420656374 03 NB R PERMIT-ENTIRE 09/23/2025 0063868 PE NAJARIAN GRANTED 09/23/2016
 STRUCTURE, FOUNDATION & EXCAVATION FILED HEREWITH IN CONJUNCTION WITH THE
 Work on Floor(s): CEL,ROF 001 thru 013

05/06/2016 420656374 02 NB Q PERMIT-PARTIAL 09/23/2025 0071681 PE TUCCI GRANTED 09/23/2016
 PL-MH-SP-SD-BL FILED HEREWITH IN CONJUNCTION WITH THE NB APPLICATION DOCUM
 Work on Floor(s): CEL,ROF 001 thru 013

04/19/2016 420656374 01 NB Q PERMIT-PARTIAL 09/23/2025 0034686 RA MAKOOI GRANTED 09/23/2016
 PROPOSED THIRTEEN STORY, 24 DWELLING UNIT RESIDENTIAL BUILDING.
 Work on Floor(s): CEL,ROF 001 thru 013

10/02/2006 402466416 02 A1 R PERMIT-ENTIRE 04/03/2008 0063652 PE Karantin NOT APPLICABLE
 Subsequent Filing to Job # 402 466 416 for boiler work. Fuel Type: Gas.
 Work on Floor(s): 005

10/02/2006 402466416 01 A1 Q PERMIT-PARTIAL 05/01/2008 0063652 PE KARANTIN NOT APPLICABLE
 PROPOSED ONE STORY ADDITION TO AN EXISTING 4 STORY BUILDING AS INDICATED
 Work on Floor(s): CEL,001,002,003,004,005



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Applications