| 01/28/2026 |
420665541 |
17 |
NB |
P APPROVED |
02/13/2026 |
|
WEST |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 02/19/2025 |
440545741 |
02 |
A3 |
P APPROVED |
11/14/2025 |
|
CARAVELL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 01/09/2024 |
420665541 |
16 |
NB |
P APPROVED |
02/02/2024 |
0020801 RA |
WEST |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 05/19/2023 |
420665541 |
15 |
NB |
P APPROVED |
05/24/2023 |
0088825 PE |
ZURICA |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 05/19/2023 |
420665541 |
14 |
NB |
P APPROVED |
05/23/2023 |
|
WEST |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 04/21/2023 |
420665541 |
13 |
NB |
P APPROVED |
05/11/2023 |
0088825 PE |
ZURICA |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 02/24/2023 |
420665541 |
12 |
NB |
P APPROVED |
03/02/2023 |
0088825 PE |
ZURICA |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 03 APPLICATION FILED FOR 24 STORY NB
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 12/05/2022 |
420665541 |
11 |
NB |
P APPROVED |
12/06/2022 |
0088825 PE |
ZURICA |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 11/07/2022 |
420665541 |
10 |
NB |
P APPROVED |
11/09/2022 |
0088825 PE |
ZURICA |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 07/08/2022 |
420665541 |
09 |
NB |
P APPROVED |
08/18/2022 |
0088825 PE |
ZURICA |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 05/11/2022 |
420665541 |
08 |
NB |
P APPROVED |
08/19/2022 |
|
WEST |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 03/16/2022 |
420665541 |
07 |
NB |
P APPROVED |
04/11/2022 |
|
WEST |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 01/18/2022 |
420665541 |
06 |
NB |
P APPROVED |
01/21/2022 |
|
WEST |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 12/16/2021 |
440562507 |
02 |
A2 |
P APPROVED |
12/21/2021 |
|
ZURICA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 10/26/2021 |
420665541 |
05 |
NB |
P APPROVED |
01/21/2022 |
0088825 PE |
ZURICA |
|
AMENDED 02/19/2020
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 03/24/2020 |
440590763 |
01 |
A3 |
X SIGNED OFF |
11/22/2022 |
0101129 PE |
BAKHTARW |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP,CEL,ROF 001 thru 024
|
| 03/24/2020 |
440590754 |
01 |
A3 |
H P/E IN PROCESS |
03/24/2020 |
0101129 PE |
BAKHTARW |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/24/2020 INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIS
|
|
Work on Floor(s): OSP,CEL,ROF 001 thru 024
|
| 03/24/2020 |
440590745 |
01 |
A3 |
H P/E IN PROCESS |
03/24/2020 |
0101129 PE |
BAKHTARW |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/24/2020 INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIS
|
|
Work on Floor(s): OSP,CEL,ROF 001 thru 024
|
| 02/21/2020 |
440586670 |
01 |
A3 |
X SIGNED OFF |
12/16/2021 |
0019131 RA |
DOOLING |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCU
|
|
Work on Floor(s): OSP,002
|
| 08/27/2019 |
440562507 |
01 |
A2 |
X SIGNED OFF |
11/22/2022 |
0088825 PE |
ZURICA |
|
NOT APPLICABLE
|
|
APPLICATION FOR FOR BOILER WORK TYPE FILED IN CONJUNCTION WITH NB APPLICAT
|
|
Work on Floor(s): ROF
|
| 08/21/2019 |
440562339 |
01 |
A2 |
H P/E IN PROCESS |
08/21/2019 |
0082512 PE |
VALJATO |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 10/20/2019 TO INSTALL CONSTRUCTION FENCES FOR SITE ENCLOSURE
|
|
Work on Floor(s): 001
|
| 05/28/2019 |
440547589 |
01 |
A2 |
X SIGNED OFF |
04/22/2022 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR CIVIL SITE AND PLUMBING WORK AS PER PLANS. NO CHANGE T
|
|
Work on Floor(s): OSP,UDG
|
| 05/10/2019 |
440545741 |
01 |
A3 |
X SIGNED OFF |
04/03/2026 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
APPLICATION FOR BPP FILED IN CONJUNCTION WITH NB #420665541 206LF.ON ARCH
|
|
Work on Floor(s): OSP
|
| 04/19/2019 |
420665541 |
04 |
NB |
R PERMIT-ENTIRE |
09/02/2020 |
0090694 PE |
CERMAK |
|
AMENDED 02/19/2020
|
|
SUBSEQUENT FILING FOR SOE SCOPE
|
|
Work on Floor(s): CEL,ROF,BLK 001 thru 024
|
| 04/19/2019 |
420665541 |
03 |
NB |
R PERMIT-ENTIRE |
09/11/2020 |
0088825 PE |
ZURICA |
|
AMENDED 02/19/2020
|
|
APPLICATION FILED FOR 24 STORY NB
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 04/19/2019 |
420665541 |
02 |
NB |
R PERMIT-ENTIRE |
09/02/2020 |
0082894 PE |
BEHAN |
|
AMENDED 02/19/2020
|
|
SUBSEQUENT FILING FOR STRUCTURAL SCOPE
|
|
Work on Floor(s): CEL,ROF,BLK 001 thru 024
|
| 04/16/2019 |
420665541 |
01 |
NB |
R PERMIT-ENTIRE |
06/12/2023 |
0020801 RA |
WEST |
|
AMENDED 02/19/2020
|
|
APPLICATION FILED FOR 24 STORY NB
|
|
Work on Floor(s): CEL,ROF 001 thru 024
|
| 12/02/1999 |
401046328 |
01 |
A3 |
R PERMIT-ENTIRE |
01/07/2000 |
OT |
SINGH |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/02/2024 EMERGENCY CONSTRUCTION OF 210LF METAL LIGHT DUTY
|
|
Work on Floor(s): 001
|
| 12/18/1997 |
400805580 |
01 |
A2 |
R PERMIT-ENTIRE |
02/12/1998 |
0038313 PE |
CHAIRO |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 02/09/2024 BOILER/BURNER REPLACEMENT FIRING #2 OIL IN RM "A"
|
|
Work on Floor(s): CEL
|
| 06/26/1991 |
400199174 |
01 |
A2 |
R PERMIT-ENTIRE |
07/09/1991 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/02/2024 INSTALL REPLACEMENT OIL BOILER AND BURNE R IN BOI
|
|
Work on Floor(s): CEL
|
| 06/26/1991 |
400199156 |
01 |
A2 |
R PERMIT-ENTIRE |
07/17/1991 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/02/2024 INSTALL REPLACEMENT BOILER AND BURNER IN BOILER R
|
|
Work on Floor(s): CEL
|