BIS Menu  |  Pre-BIS PA CO Query By Bin  |  Applications  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
 
Page: 1 of 2
Premises: 29-59 NORTHERN BOULEVARD QUEENS BIN: 4622937    Block: 403    Lot: 3

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
07/29/2022 421522267 19 NB P APPROVED 11/16/2022 0068811 PE FRANK GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 04
 Work on Floor(s): CEL,ROF,UDG 001 thru 064

05/23/2022 440728303 01 A2 X SIGNED OFF 09/07/2023 0079415 PE DIALBERT NOT APPLICABLE
 INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE I
 Work on Floor(s): ROF

05/10/2022 421664176 05 A2 P APPROVED 06/06/2022 FRANK NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

02/10/2022 421490041 03 A3 P APPROVED 04/13/2022 0081589 PE VITOLANO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

01/26/2022 421522267 18 NB P APPROVED 04/26/2022 ARAD GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

01/18/2022 421522267 17 NB P APPROVED 01/25/2022 ARAD GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

12/06/2021 440669670 05 A2 P APPROVED 12/08/2021 SCHMERZL NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

09/13/2021 440669670 04 A2 P APPROVED 09/17/2021 SCHMERZL NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

08/03/2021 440669670 03 A2 P APPROVED 08/05/2021 SCHMERZL NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

08/03/2021 440669821 03 A3 D A/P ENTIRE 10/08/2021 LOMBARDO NOT APPLICABLE
 DOC WITHDRAWN 01/05/2022
 Work on Floor(s): ROF 002 thru 063

07/21/2021 421522267 16 NB P APPROVED 07/28/2021 ARAD GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

05/21/2021 440669670 02 A2 P APPROVED 05/25/2021 SCHMERZL NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

05/19/2021 440669821 02 A3 P APPROVED 05/25/2021 LOMBARDO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): ROF 002 thru 063

05/13/2021 421522267 15 NB P APPROVED 07/28/2021 0068811 PE FRANK GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 04
 Work on Floor(s): CEL,ROF,UDG 001 thru 064

04/26/2021 440669670 01 A2 X SIGNED OFF 04/04/2024 0020635 RA SCHMERZL NOT APPLICABLE
 FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING 42152267
 Work on Floor(s): CEL,ROF 001 thru 064

04/07/2021 421522267 14 NB P APPROVED 05/03/2021 0068811 PE FRANK GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 04
 Work on Floor(s): CEL,ROF,UDG 001 thru 064

03/29/2021 440669821 01 A3 X SIGNED OFF 01/06/2022 0090287 PE LOMBARDO NOT APPLICABLE
 INSTALLATION OF SUSPENDED SCAFFOLD FILED HEREWITHIN. NO CHANGE IN EGRESS,
 Work on Floor(s): ROF 002 thru 063

03/26/2021 421664176 04 A2 P APPROVED 05/17/2021 0068811 PE FRANK NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

12/21/2020 421522267 13 NB P APPROVED 03/01/2021 ARAD GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

10/08/2020 421522267 12 NB P APPROVED 10/29/2020 ARAD GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

09/21/2020 421522267 11 NB P APPROVED 11/09/2020 0068811 PE FRANK GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 04
 Work on Floor(s): CEL,ROF,UDG 001 thru 064

09/11/2020 421664176 03 A2 P APPROVED 09/21/2020 FRANK NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

07/20/2020 421522267 10 NB P APPROVED 08/27/2020 ARAD GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

07/13/2020 421624424 03 A2 P APPROVED 07/15/2020 SEGAL NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): ROF,SC, CEL 001 thru 063

07/09/2020 421522267 09 NB P APPROVED 07/13/2020 0068811 PE FRANK GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 04
 Work on Floor(s): CEL,ROF,UDG 001 thru 064

06/25/2020 421664176 02 A2 P APPROVED 07/08/2020 FRANK NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 064

06/25/2020 421522267 08 NB P APPROVED 07/01/2020 0068811 PE FRANK GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 04
 Work on Floor(s): CEL,ROF,UDG 001 thru 064

05/12/2020 440594331 01 A3 X SIGNED OFF 04/28/2022 0078402 PE BLINN NOT APPLICABLE
 INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS DURING NB
 Work on Floor(s): 064

04/15/2020 421946764 01 A3 X SIGNED OFF 08/02/2021 0097111 PE CHARLESW NOT APPLICABLE
 INSTALLATION OF TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TEMPORARY T
 Work on Floor(s): 064,065

02/05/2020 421522267 07 NB P APPROVED 02/26/2020 ARAD GRANTED 02/16/2018
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SC, CEL,ROF 001 thru 063

11/12/2019 440531916 03 A3 P APPROVED 11/15/2019 CHARLESW NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

08/13/2019 421747774 01 A3 X SIGNED OFF 08/02/2021 0097111 PE CHARLESW NOT APPLICABLE
 INSTALLATION OF A TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TEMPORARY
 Work on Floor(s): OSP

07/16/2019 421624424 02 A2 P APPROVED 07/24/2019 0070564 PE SEGAL NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): ROF,SC, CEL 001 thru 063

05/02/2019 440531970 04 A3 P APPROVED 11/15/2019 CHARLESW NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 SOUTH HOIST: INSTALLATION OF DUAL 7800/8000
 Work on Floor(s): OSP

04/15/2019 440543119 01 A2 X SIGNED OFF 04/25/2022 0060597 PE SHAPIRO NOT APPLICABLE
 USE OF TEMPORARY MINI CRANE CONSTRUCTION EQUIPMENT AS PER PLANS FILED HERE
 Work on Floor(s): ROF 003 thru 064

04/05/2019 440541905 01 A3 X SIGNED OFF 04/23/2021 0078402 PE BLINN NOT APPLICABLE
 INSTALLATION OF TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTY DURING NEW
 Work on Floor(s): OSP

03/30/2019 421490041 02 A3 P APPROVED 04/12/2019 VITOLANO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

03/27/2019 440531970 03 A3 P APPROVED 03/28/2019 CHARLESW NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

03/15/2019 421950080 01 A3 X SIGNED OFF 11/05/2020 0082512 PE VALJATO NOT APPLICABLE
 INSTALLATION OF CONCRETE PUMP IN CONJUNCTION WITH NB 421522267. THIS APPLI
 Work on Floor(s): SC, CEL,ROF 001 thru 063

03/07/2019 440531916 02 A3 P APPROVED 03/20/2019 CHARLESW NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Pre-BIS PA CO Query By Bin  |  Applications  |  Back