Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
 
Page: 1 of 2
Premises: 42-59 CRESCENT STREET QUEENS BIN: 4616576    Block: 430    Lot: 37

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
05/28/2025 421410734 31 NB P APPROVED 06/05/2025 MUZAFFAR GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 008

04/15/2025 440663033 03 A3 P APPROVED 06/09/2025 MA NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001

03/07/2025 421410734 30 NB P APPROVED 04/02/2025 0073791 PE CHANG GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 05
 Work on Floor(s): CEL,ROF 001 thru 009

03/06/2025 421410734 29 NB P APPROVED 04/02/2025 0073791 PE CHANG GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 06
 Work on Floor(s): CEL,001

03/06/2025 421410734 28 NB P APPROVED 04/02/2025 0073791 PE CHANG GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 04
 Work on Floor(s): CEL,001

02/27/2025 421410734 27 NB P APPROVED 05/21/2025 MUZAFFAR GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 008

08/01/2024 421515471 02 A2 P APPROVED 09/30/2024 0073791 PE CHANG NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 008

05/17/2024 421410734 26 NB P APPROVED 02/26/2025 MUZAFFAR GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 008

02/28/2024 421410734 25 NB P APPROVED 04/24/2024 0071008 PE MUZAFFAR GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 01 PROPOSED 8-STORY TRANSIENT HOTEL AS SHOWN O
 Work on Floor(s): CEL,ROF 001 thru 008

12/05/2023 440663033 02 A3 P APPROVED 02/28/2024 0032328 RA MA NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001

03/28/2023 421410734 24 NB P APPROVED 05/18/2023 0073791 PE CHANG GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 05
 Work on Floor(s): CEL,ROF 001 thru 009

03/28/2023 421410734 23 NB P APPROVED 07/13/2023 0078720 PE CHANG GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 06
 Work on Floor(s): CEL,001

11/29/2022 421410734 22 NB J P/E DISAPPROVED 07/31/2023 0026432 RA ZABASAJJ GRANTED 03/21/2017
 DOC WITHDRAWN 01/23/2024
 Work on Floor(s): CEL,ROF 001 thru 008

11/14/2022 421410734 21 NB P APPROVED 11/24/2022 ZABASAJJ GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 008

07/29/2022 421410734 20 NB P APPROVED 09/15/2022 0078720 PE CHANG GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 06
 Work on Floor(s): CEL,001

07/29/2022 421410734 19 NB P APPROVED 08/19/2022 0073791 PE CHANG GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 05
 Work on Floor(s): CEL,ROF 001 thru 009

07/29/2022 421410734 18 NB P APPROVED 08/12/2022 ZABASAJJ GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 01 PROPOSED 8-STORY TRANSIENT HOTEL AS SHOWN O
 Work on Floor(s): CEL,ROF 001 thru 008

01/22/2021 440663033 01 A3 X SIGNED OFF 12/29/2025 0032328 RA MA NOT APPLICABLE
 PROPOSED BUILDER'S PAVEMENT PLAN FILED WITH TOTAL OF 107.00 LINEAR FEET IN
 Work on Floor(s): 001

11/02/2020 421410734 17 NB P APPROVED 06/15/2022 0026432 RA ZABASAJJ GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 008

05/31/2019 421920345 01 A3 D A/P ENTIRE 05/31/2019 0033652 RA STILES NOT APPLICABLE
 JOB WITHDRAWN 04/23/2025 FIRE PROTECTION PLAN
 Work on Floor(s): CEL,ROO 001 thru 008

05/30/2019 421410734 16 NB P APPROVED 10/05/2022 0078720 PE CHANG GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 04
 Work on Floor(s): CEL,001

421883947 01 A3 A PRE-FILED 04/11/2019 0063062 PE KATERIN NOT APPLICABLE
 JOB WITHDRAWN 05/21/2020 FIRE PROTECTION PLAN
 Work on Floor(s): CEL,ROO 001 thru 008

04/11/2019 421883750 01 A2 R PERMIT-ENTIRE 11/25/2020 0073791 PE CHANG NOT APPLICABLE
 JOB WITHDRAWN 06/30/2025 INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO
 Work on Floor(s): CEL,ROF 001 thru 008

11/09/2018 421410734 15 NB P APPROVED 04/12/2019 0073791 PE CHANG GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 05
 Work on Floor(s): CEL,ROF 001 thru 009

09/28/2018 421410734 14 NB P APPROVED 04/12/2019 0078720 PE CHANG GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 06
 Work on Floor(s): CEL,001

09/25/2018 421410734 13 NB D A/P ENTIRE 10/11/2018 KATERINI GRANTED 03/21/2017
 DOC WITHDRAWN 03/17/2025
 Work on Floor(s): CEL,ROF 001 thru 009

05/04/2018 421410734 12 NB J P/E DISAPPROVED 11/13/2018 0083432 PE CHAN GRANTED 03/21/2017
 DOC WITHDRAWN 03/04/2025
 Work on Floor(s): CEL 001 thru 009

04/20/2018 421410734 11 NB P APPROVED 05/29/2019 0033652 RA STILES GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 008

09/01/2017 421410734 10 NB P APPROVED 09/12/2017 0083432 PE CHAN GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): CEL 001 thru 009

07/07/2017 421410734 09 NB P APPROVED 07/10/2017 0083432 PE CHAN GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): CEL 001 thru 009

07/06/2017 421410734 08 NB P APPROVED 07/10/2017 0083432 PE CHAN GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): CEL 001 thru 009

07/06/2017 421410734 07 NB P APPROVED 07/10/2017 0063062 PE KATERINI GRANTED 03/21/2017
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 009

06/14/2017 421515471 01 A2 X SIGNED OFF 03/11/2025 0073791 PE CHANG NOT APPLICABLE
 INSTALLATION OF TEMPORARY STANDPIPE WITH AN AIR ALARM, AS PER LOCAL LAWS 6
 Work on Floor(s): CEL,ROF 001 thru 008

05/12/2017 421410734 06 NB R PERMIT-ENTIRE 05/09/2018 0073791 PE CHANG GRANTED 03/21/2017
 HEREWITH FILED, SPRINKLER AND STANDPIPE PLANS
 Work on Floor(s): CEL,001

05/12/2017 421410734 05 NB R PERMIT-ENTIRE 05/08/2018 0073791 PE CHANG GRANTED 03/21/2017
 HEREWITH FILING NEW BUILDING PLUMBING WORK
 Work on Floor(s): CEL,ROF 001 thru 009

05/12/2017 421410734 04 NB R PERMIT-ENTIRE 05/09/2018 0073791 PE CHANG GRANTED 03/21/2017
 HEREWITH FILED, MECHANICAL AND FUEL STORAGE FOR NEW BUILDING
 Work on Floor(s): CEL,001

03/20/2017 421410734 03 NB R PERMIT-ENTIRE 05/09/2018 0083432 PE CHAN GRANTED 03/21/2017
 HEREWITH FILE SOE, FOUNDATION, UNDERPINNING, SHORING, EXCAVATION PLANS.
 Work on Floor(s): CEL 001 thru 009

03/20/2017 421410734 02 NB R PERMIT-ENTIRE 05/09/2018 0083432 PE CHAN GRANTED 03/21/2017
 HEREWITH FILE STRUCTURAL PLANS
 Work on Floor(s): CEL 001 thru 009

03/01/2017 421436422 01 A3 J P/E DISAPPROVED 03/02/2017 0063062 PE KATERINI NOT APPLICABLE
 JOB WITHDRAWN 03/15/2024 PROPOSED BUILDER'S PAVEMENT PLAN FILED WITH TOTAL
 Work on Floor(s): 001

12/14/2016 421410734 01 NB R PERMIT-ENTIRE 12/20/2024 0071008 PE MUZAFFAR GRANTED 03/21/2017
 PROPOSED 8-STORY TRANSIENT HOTEL AS SHOWN ON DRAWINGS FILED HEREWITH.
 Work on Floor(s): CEL,ROF 001 thru 008