 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/01/2019 |
421092105 |
24 |
NB |
P APPROVED |
07/12/2019 |
0079440 PE |
HUSSAIN |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): ROF 001 thru 012
|
| 05/31/2019 |
421092105 |
23 |
NB |
P APPROVED |
06/07/2019 |
0079440 PE |
HUSSAIN |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): ROF 001 thru 012
|
| 10/24/2018 |
421092105 |
22 |
NB |
P APPROVED |
11/27/2018 |
|
ZAIDI |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 012
|
| 09/13/2018 |
421092105 |
21 |
NB |
P APPROVED |
09/14/2018 |
|
ZAIDI |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 012
|
| 08/31/2018 |
421092105 |
20 |
NB |
P APPROVED |
09/10/2018 |
|
ZAIDI |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 012
|
| 08/09/2018 |
421092105 |
19 |
NB |
P APPROVED |
08/15/2018 |
|
ZAIDI |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 012
|
| 08/08/2018 |
421092105 |
18 |
NB |
P APPROVED |
08/15/2018 |
0079440 PE |
HUSSAIN |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): ROF 001 thru 012
|
| 07/26/2018 |
421092105 |
17 |
NB |
P APPROVED |
07/30/2018 |
0079440 PE |
HUSSAIN |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): ROF 001 thru 012
|
| 07/26/2018 |
421092105 |
16 |
NB |
P APPROVED |
07/30/2018 |
0079440 PE |
HUSSAIN |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): ROF,OSP,GND 001 thru 012
|
| 07/20/2018 |
421092105 |
15 |
NB |
D A/P ENTIRE |
07/23/2018 |
0079440 PE |
HUSSAIN |
|
AMENDED 11/05/2015
|
|
DOC WITHDRAWN 07/26/2018
|
|
Work on Floor(s): ROF 001 thru 012
|
| 06/01/2018 |
421586947 |
03 |
A2 |
P APPROVED |
06/06/2018 |
|
HUSSAIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 012
|
| 03/24/2018 |
421092105 |
14 |
NB |
P APPROVED |
06/29/2018 |
0079440 PE |
HUSSAIN |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): ROF 001 thru 012
|
| 01/12/2018 |
421586947 |
02 |
A2 |
R PERMIT-ENTIRE |
03/05/2018 |
0079440 PE |
HUSSAIN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 06/05/2019 ADDING PLUMBING WORK TYPE TO FILING
|
|
Work on Floor(s): ROF 001 thru 012
|
| 12/21/2017 |
421586947 |
01 |
A2 |
X SIGNED OFF |
06/11/2019 |
0079440 PE |
HUSSAIN |
|
NOT APPLICABLE
|
|
HEREWITH FILING BOILER APPLICATION IN CONJUNCTION WITH NEW BUILDING APPLIC
|
|
Work on Floor(s): ROF 001 thru 012
|
| 05/18/2017 |
421485592 |
01 |
A2 |
X SIGNED OFF |
01/17/2019 |
0022382 RA |
TARTAGLI |
|
NOT APPLICABLE
|
|
INSTALLATION OF A REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH A PAS
|
|
Work on Floor(s): ROF 001 thru 012
|
| 01/19/2017 |
421092105 |
13 |
NB |
P APPROVED |
06/27/2018 |
0039291 RA |
ZAIDI |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 012
|
| 12/13/2016 |
440334087 |
03 |
A3 |
P APPROVED |
12/16/2016 |
|
ZDANCEWI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 10/08/2016 |
440334087 |
02 |
A3 |
P APPROVED |
10/12/2016 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/24/2016 |
440338582 |
01 |
A3 |
X SIGNED OFF |
04/27/2018 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL
|
|
Work on Floor(s): OSP
|
| 08/09/2016 |
440334087 |
01 |
A3 |
X SIGNED OFF |
06/25/2018 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL
|
|
Work on Floor(s): OSP
|
| 07/18/2016 |
440326531 |
01 |
A3 |
X SIGNED OFF |
01/23/2018 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SINGLE 6000 LB PERSONNEL/MATERIAL HOIST AS PER PLANS DURIN
|
|
Work on Floor(s): OSP
|
| 05/27/2016 |
421268933 |
02 |
A3 |
P APPROVED |
05/27/2016 |
|
HALL |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/21/2018
|
|
Work on Floor(s): OSP
|
| 05/21/2016 |
421092105 |
12 |
NB |
P APPROVED |
06/02/2016 |
|
HALL |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 012
|
| 02/25/2016 |
421268933 |
01 |
A3 |
R PERMIT-ENTIRE |
08/10/2016 |
0071543 PE |
HALL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/21/2018 FILING SCAFFOLDING IN CONJUNCTION WITH NEW 12 STO
|
|
Work on Floor(s): OSP
|
| 02/09/2016 |
421092105 |
11 |
NB |
P APPROVED |
02/09/2016 |
|
HALL |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 012
|
| 11/12/2015 |
421232026 |
01 |
A2 |
X SIGNED OFF |
03/15/2019 |
0079440 PE |
RITIENI |
|
NOT APPLICABLE
|
|
INSTALLATION OF A NEW AUTOMATIC,SMOKE,HEAT,CO DETECTION,SPRINKLER ALARM
|
|
Work on Floor(s): ROF 001 thru 012
|
| 09/09/2015 |
421092105 |
10 |
NB |
P APPROVED |
11/05/2015 |
|
HALL |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 01 ERECTION OF A NEW 12 STORY MIX USE BUILDING
|
|
Work on Floor(s): ROF 001 thru 012
|
| 09/05/2015 |
421092105 |
09 |
NB |
P APPROVED |
10/19/2015 |
0079440 PE |
HUSSAIN |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): ROF,OSP,GND 001 thru 012
|
| 09/02/2015 |
421211165 |
01 |
A3 |
X SIGNED OFF |
12/11/2018 |
0071543 PE |
HALL |
|
NOT APPLICABLE
|
|
HEREWITH FILING CURB CUT IN CONJUNCTION WITH APPLICATION NUMBER 421092105
|
|
Work on Floor(s): OSP
|
| 08/19/2015 |
421092105 |
08 |
NB |
P APPROVED |
08/26/2015 |
0079440 PE |
HUSSAIN |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): ROF 001 thru 012
|
| 08/11/2015 |
421200603 |
01 |
A3 |
R PERMIT-ENTIRE |
08/17/2015 |
0071543 PE |
HALL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/26/2017 HEREWITH FLING TO ERECT SIDEWALK SHED AS SHOWN ON
|
|
Work on Floor(s): OSP
|
| 08/04/2015 |
421092105 |
07 |
NB |
P APPROVED |
09/02/2015 |
0082605 PE |
PAN |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): ROF 001 thru 012
|
| 08/04/2015 |
421168104 |
02 |
A2 |
P APPROVED |
08/20/2015 |
|
HALL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 012
|
| 07/28/2015 |
421092105 |
06 |
NB |
P APPROVED |
08/17/2015 |
0071543 PE |
HALL |
|
AMENDED 11/05/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 009
|
| 06/12/2015 |
421168104 |
01 |
A2 |
X SIGNED OFF |
06/13/2019 |
0071543 PE |
HALL |
|
NOT APPLICABLE
|
|
FILING FOR THE INSTALLATION OF TEMPORARY STANDPIPE IN CONJUNCTION WITH
|
|
Work on Floor(s): ROF 001 thru 012
|
|
421175150 |
01 |
A2 |
A PRE-FILED |
06/11/2015 |
0079440 PE |
HUSSAIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/06/2015 FILING FOR THE INSTALLATION OF TEMPORARY STANDPIP
|
|
Work on Floor(s): ROF 001 thru 009
|
| 06/05/2015 |
421175169 |
01 |
A3 |
X SIGNED OFF |
12/18/2018 |
0071543 PE |
HALL |
|
NOT APPLICABLE
|
|
BUILDERS PAVEMENT FILING IN CONJUNCTION WITH NB# 421092105 FOR 417 LF OF
|
|
Work on Floor(s): ROF 001 thru 009
|
| 05/26/2015 |
421092105 |
05 |
NB |
X SIGNED OFF |
08/12/2019 |
0087378 PE |
WANG |
|
AMENDED 11/05/2015
|
|
SUBSEQUENT FILING FOR SUPPORT OF EXCAVATION IN CONJUNCTION WITH NB# 42109
|
|
Work on Floor(s): OSP
|
| 05/26/2015 |
421092105 |
04 |
NB |
X SIGNED OFF |
08/12/2019 |
0079440 PE |
HUSSAIN |
|
AMENDED 11/05/2015
|
|
SUBSEQUENT FILING TO NB#421092105 FOR THE SPRINKLER/STANDPIPE INSTALLATION
|
|
Work on Floor(s): ROF 001 thru 012
|
| 05/13/2015 |
421092105 |
03 |
NB |
X SIGNED OFF |
08/12/2019 |
0082605 PE |
PAN |
|
AMENDED 11/05/2015
|
|
SUBSEQUENT FILING TO NB # 421092105 TO TAKE RESPONSIBILITY FOR STRUCTURAL
|
|
Work on Floor(s): ROF 001 thru 012
|