BIS Menu  |  Marquee Query  |  Property Profile  |  Applications  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
 
Page: 1 of 3
Premises: 22-34 JACKSON AVENUE QUEENS BIN: 4596913    Block: 86    Lot: 1

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
12/04/2024 421589597 03 A2 P APPROVED 04/09/2025 CHELLIAH NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PEN,ROF 001 thru 048

05/31/2024 440169817 04 A3 P APPROVED 06/05/2024 0081702 PE FRANZ NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

05/30/2024 420651912 22 NB P APPROVED 06/13/2024 MENDOZA AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

05/12/2023 420651912 21 NB P APPROVED 06/20/2023 MENDOZA AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

05/12/2023 440169817 03 A3 P APPROVED 05/17/2023 FRANZ NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

03/08/2023 420651912 20 NB P APPROVED 03/10/2023 0060293 PE ETTINGER AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 05
 Work on Floor(s): 003 thru 041

11/30/2022 420651912 19 NB P APPROVED 11/30/2022 MENDOZA AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

07/15/2022 440611116 07 A2 G PAA FEE DUE 07/15/2022 SCHMERZL NOT APPLICABLE
 DOC WITHDRAWN 02/08/2024
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

11/29/2021 420651912 18 NB P APPROVED 12/22/2021 MENDOZA AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

09/02/2021 420651912 17 NB P APPROVED 10/12/2021 MENDOZA AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

08/24/2021 440169817 02 A3 P APPROVED 09/14/2021 FRANZ NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

08/18/2021 440202308 05 A2 P APPROVED 09/03/2021 ETTINGER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

08/05/2021 440611116 06 A2 P APPROVED 10/21/2021 SCHMERZL NOT APPLICABLE
 DOC WITHDRAWN 02/08/2024
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

07/26/2021 420651912 16 NB P APPROVED 09/03/2021 0060293 PE ETTINGER AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 05
 Work on Floor(s): 003 thru 041

07/21/2021 421238538 02 A2 P APPROVED 07/28/2021 0095920 PE MENDOZA NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

07/21/2021 421147100 02 A3 P APPROVED 07/28/2021 0095920 PE MENDOZA NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

07/21/2021 421091963 03 A3 P APPROVED 07/28/2021 0095920 PE MENDOZA NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

07/20/2021 421268489 02 A3 P APPROVED 07/28/2021 0095920 PE MENDOZA NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

07/20/2021 440611116 05 A2 P APPROVED 07/28/2021 SCHMERZL NOT APPLICABLE
 DOC WITHDRAWN 02/08/2024
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

07/07/2021 420651912 15 NB P APPROVED 07/13/2021 MENDOZA AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

06/15/2021 421330134 02 A2 P APPROVED 10/21/2022 ETTINGER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DET
 Work on Floor(s): CEL,ROF,PT1 001 thru 048

06/07/2021 440611116 04 A2 P APPROVED 06/11/2021 SCHMERZL NOT APPLICABLE
 DOC WITHDRAWN 02/08/2024
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

04/29/2021 440611116 03 A2 P APPROVED 05/06/2021 SCHMERZL NOT APPLICABLE
 DOC WITHDRAWN 02/08/2024
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

04/07/2021 421766173 01 SC U COMPLETED 04/13/2021 0095920 PE MENDOZA NOT APPLICABLE
 CONDOMINIUM SUBDIVISION. NO CHANGE TO ZONING LOT METES & BOUNDS. NEW
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

04/05/2021 440611116 02 A2 P APPROVED 04/19/2021 SCHMERZL NOT APPLICABLE
 DOC WITHDRAWN 02/08/2024
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

03/12/2021 440202308 04 A2 P APPROVED 03/16/2021 ETTINGER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

02/24/2021 420651912 14 NB P APPROVED 04/16/2021 MENDOZA AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

12/28/2020 440335816 02 A3 P APPROVED 01/07/2021 ZDANCEWI NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

12/17/2020 420651912 13 NB P APPROVED 01/14/2021 MENDOZA AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

10/27/2020 420651912 12 NB P APPROVED 12/07/2020 MENDOZA AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

10/21/2020 420651912 11 NB P APPROVED 12/07/2020 0060293 PE ETTINGER AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 05
 Work on Floor(s): 003 thru 041

10/16/2020 440635546 01 A2 X SIGNED OFF 12/07/2022 0095920 PE MENDOZA NOT APPLICABLE
 THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR A SALES OFFICE WI
 Work on Floor(s): OSP,021

10/15/2020 420651912 10 NB P APPROVED 12/07/2020 0060293 PE ETTINGER AMENDED 04/16/2021
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

10/15/2020 440202308 03 A2 P APPROVED 11/10/2020 ETTINGER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

08/14/2020 440618155 01 A3 X SIGNED OFF 05/21/2021 0090287 PE LOMBARDO NOT APPLICABLE
 INSTALLATION AND USE TEMPORARY MATERIAL HOIST PER PLANS FILED HEREWITH. NO
 Work on Floor(s): 006,OSP

07/23/2020 440611116 01 A2 P APPROVED 07/23/2020 0020635 RA SCHMERZL NOT APPLICABLE
 JOB WITHDRAWN 02/08/2024 FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

07/23/2020 440202308 02 A2 P APPROVED 09/30/2020 ETTINGER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PT1,PT2,ROF 001 thru 048

05/20/2020 421589597 02 A2 P APPROVED 11/08/2021 CHELLIAH NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,PEN,ROF 001 thru 048

12/06/2019 440577582 01 A3 X SIGNED OFF 10/23/2020 0097111 PE CHARLESW NOT APPLICABLE
 INSTALLATION OF CANTILEVERED TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS
 Work on Floor(s): OSP,003

12/03/2019 440577136 01 A3 X SIGNED OFF 04/30/2020 0071719 PE UDDIN NOT APPLICABLE
 INSTALLATION OF TEMPORARY SHORING. WORK SHALL COMPLY WITH 2014 BUILDING CO
 Work on Floor(s): OSP



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Marquee Query  |  Property Profile  |  Applications  |  Back