| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/02/2021 |
420967421 |
17 |
NB |
P APPROVED |
04/09/2021 |
|
SULTANA |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 008
|
| 03/09/2021 |
440225132 |
05 |
A3 |
P APPROVED |
03/09/2021 |
|
WANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 002
|
| 02/04/2021 |
420967421 |
16 |
NB |
P APPROVED |
02/11/2021 |
|
SULTANA |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 008
|
| 08/13/2020 |
420967421 |
15 |
NB |
P APPROVED |
11/16/2020 |
|
SULTANA |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 008
|
| 08/11/2020 |
421180377 |
02 |
A3 |
P APPROVED |
02/12/2021 |
|
SULTANA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 05/30/2019 |
420967421 |
14 |
NB |
P APPROVED |
11/16/2020 |
0093795 PE |
XIA |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL 001 thru 008
|
| 01/05/2019 |
420967421 |
13 |
NB |
P APPROVED |
02/27/2019 |
|
SULTANA |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 008
|
| 05/21/2018 |
420967421 |
12 |
NB |
P APPROVED |
12/03/2020 |
0093795 PE |
LIANKAI |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL 001 thru 008
|
| 05/21/2018 |
420967421 |
11 |
NB |
P APPROVED |
02/27/2019 |
0074354 PE |
WANG |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL 001 thru 008
|
| 05/02/2018 |
440225132 |
04 |
A3 |
P APPROVED |
05/11/2018 |
|
WANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 002
|
| 04/24/2018 |
420967421 |
10 |
NB |
P APPROVED |
05/08/2018 |
|
SULTANA |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 008
|
| 04/24/2018 |
420967421 |
09 |
NB |
P APPROVED |
05/08/2018 |
0093795 PE |
XIA |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL 001 thru 008
|
| 01/19/2018 |
440225132 |
03 |
A3 |
P APPROVED |
01/23/2018 |
|
WANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 002
|
| 12/11/2017 |
420967421 |
08 |
NB |
P APPROVED |
01/05/2018 |
0093795 PE |
XIA |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL 001 thru 008
|
| 03/28/2017 |
420967421 |
07 |
NB |
P APPROVED |
12/01/2017 |
0093795 PE |
LIANKAI |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL 001 thru 008
|
| 10/13/2016 |
440225132 |
02 |
A3 |
P APPROVED |
03/24/2017 |
0074354 PE |
WANG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 002
|
| 09/28/2016 |
421373873 |
01 |
SI |
U COMPLETED |
09/28/2016 |
0027357 RA |
SULTANA |
|
NOT APPLICABLE
|
|
HEREWITH FILING SITE IMPROVEMENT TO MERGE EXISTING LOT 3,102,1,56 TO NEW L
|
|
Work on Floor(s): OSP
|
| 09/17/2016 |
420967421 |
06 |
NB |
P APPROVED |
01/05/2018 |
0074354 PE |
WANG |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL 001 thru 008
|
| 03/03/2016 |
420967421 |
05 |
NB |
P APPROVED |
12/01/2017 |
0027357 RA |
SULTANA |
|
GRANTED 06/22/2015
|
|
POST APPROVAL AMENDMENT FOR 01 PROPOSED NEW 8 STORIES WITH 45 DWELLING UNI
|
|
Work on Floor(s): CEL 001 thru 008
|
| 12/03/2015 |
440273133 |
01 |
A3 |
X SIGNED OFF |
10/19/2020 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2014 BU
|
|
Work on Floor(s): OSP
|
| 10/30/2015 |
440263812 |
01 |
A3 |
X SIGNED OFF |
10/19/2020 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BU
|
|
Work on Floor(s): OSP
|
| 08/06/2015 |
440225132 |
01 |
A3 |
X SIGNED OFF |
03/11/2021 |
0074354 PE |
WANG |
|
NOT APPLICABLE
|
|
THIS APPLICATION IS FILED TO DO SHORING IN CONJUNCTION OF DOB JOB NO. 420
|
|
Work on Floor(s): 001 thru 002
|
| 06/30/2015 |
420967421 |
04 |
NB |
X SIGNED OFF |
04/16/2021 |
0093795 PE |
LIANKAI |
|
GRANTED 06/22/2015
|
|
PROPOSED SPRINKLERS.
|
|
Work on Floor(s): CEL 001 thru 008
|
| 06/30/2015 |
420967421 |
03 |
NB |
X SIGNED OFF |
04/16/2021 |
0093795 PE |
XIA |
|
GRANTED 06/22/2015
|
|
PROPOSED MECHANICAL AND PLUMBING WORK.
|
|
Work on Floor(s): CEL 001 thru 008
|
| 06/22/2015 |
421180377 |
01 |
A3 |
X SIGNED OFF |
02/24/2021 |
0027357 RA |
SULTANA |
|
NOT APPLICABLE
|
|
BUILDERS PAVEMENT PLAN
|
|
Work on Floor(s): OSP
|
| 06/18/2015 |
420967421 |
02 |
NB |
X SIGNED OFF |
04/16/2021 |
0074354 PE |
WANG |
|
GRANTED 06/22/2015
|
|
THIS APPLICATION IS TO IDENTIFY THE ENGINEER RESPONSIBILITY FOR STRUCTURAL
|
|
Work on Floor(s): CEL 001 thru 008
|
| 05/01/2014 |
420967421 |
01 |
NB |
X SIGNED OFF |
04/16/2021 |
0027357 RA |
SULTANA |
|
GRANTED 06/22/2015
|
|
PROPOSED NEW 8 STORIES WITH 45 DWELLING UNITS
|
|
Work on Floor(s): CEL 001 thru 008
|
| 02/19/2014 |
420948602 |
01 |
A3 |
X SIGNED OFF |
08/10/2020 |
0027357 RA |
SULTANA |
|
NOT APPLICABLE
|
|
THIS APPLICATION IS FILED FOR FENCE.
|
|
Work on Floor(s): OSP
|
| 05/29/2009 |
420022807 |
01 |
A2 |
P APPROVED |
09/11/2009 |
0070916 PE |
GULINO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/22/2020 STRUCTURAL, SHORING & UNDERPINNING WORK FILED IN
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 04/02/2009 |
420001679 |
01 |
A2 |
P APPROVED |
04/22/2009 |
0063353 PE |
MORTMAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/22/2020 INSTALL MECHAINCAL AND BOILER EQUIPMENT PER PLANS
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 03/27/2009 |
420037542 |
01 |
A2 |
P APPROVED |
05/05/2009 |
0063353 PE |
MORTMAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/22/2020 INSTALL FIRE SPRINKLER SYSTEM PER PLANS FILED HER
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 03/24/2009 |
410237863 |
01 |
A3 |
R PERMIT-ENTIRE |
03/24/2009 |
0027357 RA |
SULTANA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/15/2021 BUILDER PAVEMENT PLAN
|
|
Work on Floor(s): OSP
|
| 09/16/2008 |
410165011 |
01 |
A3 |
X SIGNED OFF |
06/11/2010 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF FENCE 110' LONG ON 21 STREET, 25'LONG ON 31 AVENUE AND FEN
|
|
Work on Floor(s): OSP
|
| 09/12/2008 |
410164940 |
01 |
A3 |
X SIGNED OFF |
06/11/2010 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF 180' LONG HEAVY DUTY SIDEWALK SHED: 110'L X 16'H X 12'W ON
|
|
Work on Floor(s): OSP
|
|
410155941 |
01 |
A3 |
A PRE-FILED |
08/22/2008 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/22/2020 INSTALLATION OF 185' LONG HEAVY DUTY SIDEWALK SHE
|
|
Work on Floor(s): GRD
|
|
410155932 |
01 |
A3 |
A PRE-FILED |
08/22/2008 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/22/2020 INSTALLATION OF FENCE 110' LONG ON 21 STREET AND
|
|
Work on Floor(s): GRD
|
|
410139390 |
02 |
NB |
A PRE-FILED |
08/11/2008 |
0070916 PE |
GULINO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/22/2020 SUBSEQUENT FILING FOR SHORING , UNDERPINNING
|
|
Work on Floor(s): OSP
|
| 07/18/2008 |
410139390 |
01 |
NB |
P APPROVED |
05/04/2009 |
0027357 RA |
SULTANA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/22/2020 PROPOSED SIX STORY COMMUNITY FACILITY AND RESIDEN
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 02/08/2006 |
402286432 |
01 |
A2 |
R PERMIT-ENTIRE |
02/13/2006 |
0056767 PE |
SIDDIQUE |
Y |
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/27/2020 APPLICATION FILE TO REMOVE VIOLATION #34506458L,
|
|
Work on Floor(s): 001
|