 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 08/12/2015 |
440243336 |
PR |
E LAA FILED |
08/12/2015 |
MP 000772 |
GLEIXNER |
|
REBUILD EXISTING METER BANK AS NECESSARY TO REPAIR LEAK AND PERFORM INTEGR
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 06/24/2015 |
440229619 |
PR |
E LAA FILED |
06/24/2015 |
MP 000772 |
GLEIXNER |
|
RUN 2 INCH COPPER FOR TEMPORARY HOT WATER FROM TEMPORARY BOILER ON STREET
|
|
Work on Floor(s): 001 thru 006
|
| 09/30/2013 |
420761312 |
PR |
A LAA PREFILED |
09/30/2013 |
FSC 000760 |
DUVAL |
|
REPLACEMENT OF (1) DIRECT VENT HIGH EFFICIENCY GAS BOILER AND (1) INDIRECT
|
|
Work on Floor(s): CEL
|
| 05/24/2013 |
420453510 |
PR |
E LAA FILED |
05/29/2013 |
MP 001730 |
DUVAL |
|
REPLACEMENT OF (1) DIRECT HIGH EFFICIENCY GAS BOILER IN CELLAR. ORIGINALLY
|
|
Work on Floor(s): CEL
|