 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/27/2019 |
421743304 |
01 |
A2 |
X SIGNED OFF |
02/18/2020 |
0070181 PE |
CHAO |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AT APT.3F, INCLUDING PARTITION WORK AND FLOORING,CEIL
|
|
Work on Floor(s): 003
|
| 11/25/2014 |
421056751 |
01 |
A2 |
X SIGNED OFF |
05/20/2015 |
0013891 RA |
CHIN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION IN APT.3K,INCLUDING PARTITION WORK AND DOOR FOR
|
|
Work on Floor(s): 003
|
| 11/21/2014 |
421053068 |
01 |
A2 |
B A/P UNPAID |
11/21/2014 |
0013891 RA |
CHIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/08/2014 INTERIOR RENOVATION IN APT.3K,INCLUDING PARTITION
|
|
Work on Floor(s): 003
|
| 09/27/2013 |
420900546 |
01 |
A2 |
R PERMIT-ENTIRE |
10/09/2013 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND BURNER. CHANGE FUEL FROM #6 OIL TO #2 OIL AND GAS. IN
|
|
Work on Floor(s): CEL
|
| 07/13/1992 |
400319623 |
01 |
A2 |
X SIGNED OFF |
12/09/1992 |
0049248 PE |
LIANG |
|
NOT APPLICABLE
|
|
INSTALL REFUSE COMPACTOR IN INCINERATOR ROOM IN CELLAR.NO CHANGE IN USE,
|
|
Work on Floor(s): CEL
|