 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/21/2019 |
421951070 |
01 |
A2 |
R PERMIT-ENTIRE |
03/21/2019 |
0034135 RA |
ZAPATA |
|
NOT APPLICABLE
|
|
NEW MAIN ENTRANCE PORTICO BUILDING 19
|
|
Work on Floor(s): 1ST 001 thru 002
|
| 12/24/2015 |
421241150 |
01 |
A3 |
X SIGNED OFF |
07/21/2017 |
0034135 RA |
ZAPATA |
|
NOT APPLICABLE
|
|
SHINGLES ROOF REPLACEMENT THAT INCLUDES GUTTERS AND DOWNSPOUTS. MASONRY RE
|
|
Work on Floor(s): 1ST,2ND,ROO 001 thru 003
|
| 09/24/2015 |
440254564 |
01 |
A3 |
R PERMIT-ENTIRE |
10/16/2015 |
0034135 RA |
ZAPATA |
|
NOT APPLICABLE
|
|
HEAVY DUTY SIDEWALK SHED INSTALLATION AS PER 2014 CODE.
|
|
Work on Floor(s): 1ST,2ND,ROO 001 thru 003
|
| 09/21/2015 |
440253707 |
01 |
A3 |
H P/E IN PROCESS |
09/21/2015 |
0034135 RA |
ZAPATA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/21/2015 HEAVY DUTY SIDEWALK SHED INSTALLATION AS PER 2014
|
|
Work on Floor(s): 1ST,2ND,ROO 001 thru 003
|
| 05/20/2014 |
420953221 |
02 |
A2 |
P APPROVED |
08/28/2014 |
|
GUTHARTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 03/03/2014 |
420953221 |
01 |
A2 |
X SIGNED OFF |
06/02/2015 |
0018233 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
PERFORM SHORING & WATERPROOFING FOR UNDERGROUND FOUNDATION WALL.
|
|
Work on Floor(s): OSP
|
| 06/08/2009 |
420026199 |
01 |
A2 |
R PERMIT-ENTIRE |
06/08/2009 |
0062959 PE |
MCNAMARA |
|
NOT APPLICABLE
|
|
INSTALL NEW HEATING SYSTEM AND TWO (2) BOILERS PER PLANS.
|
|
Work on Floor(s): CEL,OSP 001 thru 002
|