| 08/20/2020 |
421515006 |
03 |
A2 |
P APPROVED |
08/21/2020 |
|
MCCUNE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): ROF
|
| 11/15/2019 |
421907672 |
01 |
A2 |
X SIGNED OFF |
08/12/2020 |
0020632 RA |
SAVARESE |
|
NOT APPLICABLE
|
|
PARTITION, FINISH AND FIXTURE WORK FOR COMMERCIAL SPACE RENOVATION. RELATE
|
|
Work on Floor(s): 001
|
| 10/29/2019 |
421656470 |
02 |
A2 |
P APPROVED |
04/23/2020 |
|
MORALI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1ST
|
| 10/15/2019 |
421656470 |
01 |
A2 |
X SIGNED OFF |
06/18/2020 |
0017683 RA |
MORALI |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING COMMERCIAL TENANT SPACE AT 1ST FLOOR TO CR
|
|
Work on Floor(s): 1ST
|
| 03/06/2019 |
421515006 |
02 |
A2 |
R PERMIT-ENTIRE |
08/06/2019 |
0067502 PE |
MCCUNE |
|
NOT APPLICABLE
|
|
RELATED PLUMBING WORK FOR NEW BOILER. NO CHANGE TO USE, EGRESS OR OCCUPANC
|
|
Work on Floor(s): ROF
|
| 01/24/2019 |
421515006 |
01 |
A2 |
R PERMIT-ENTIRE |
07/10/2020 |
0067502 PE |
MCCUNE |
|
NOT APPLICABLE
|
|
INSTALL TWO NEW GAS FIRED BOILERS WITH RELATED EQUIPMENT, EXHAUST AND DUCT
|
|
Work on Floor(s): ROF
|
| 04/25/2016 |
440306811 |
01 |
A3 |
R PERMIT-ENTIRE |
04/26/2016 |
0035839 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS.
|
|
Work on Floor(s): OSP
|
| 06/11/2015 |
420808601 |
04 |
A2 |
P APPROVED |
06/25/2015 |
|
KIM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 04/25/2015 |
420808601 |
03 |
A2 |
P APPROVED |
05/07/2015 |
0088689 PE |
KIM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 12/07/2013 |
420808601 |
02 |
A2 |
P APPROVED |
12/12/2013 |
0026097 RA |
ITALIANO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 03/05/2013 |
420808601 |
01 |
A2 |
X SIGNED OFF |
08/03/2015 |
0088689 PE |
KIM |
|
NOT APPLICABLE
|
|
PROPOSED MINOR WORK IN EXISTING SECOND FLOOR AS PER PLANS. NO STRUCTURAL W
|
|
Work on Floor(s): 002
|
| 12/22/2010 |
420272868 |
02 |
A2 |
P APPROVED |
12/30/2010 |
|
FISCHER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 11/24/2010 |
420275623 |
02 |
A2 |
P APPROVED |
12/07/2010 |
|
RINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 11/19/2010 |
420289388 |
01 |
A2 |
P APPROVED |
11/19/2010 |
0063868 PE |
NAJARIAN |
|
NOT APPLICABLE
|
|
INSTALL STRUCTURAL SUPPORT FOR AC UNIT. ALL MECHANICAL WORK FILED UNDER A
|
|
Work on Floor(s): 001
|
| 10/21/2010 |
420275614 |
01 |
A2 |
X SIGNED OFF |
07/07/2011 |
0068464 PE |
RINI |
|
NOT APPLICABLE
|
|
HEREBY FILING SPRINKLER WORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHAN
|
|
Work on Floor(s): 001
|
| 10/14/2010 |
420275623 |
01 |
A2 |
X SIGNED OFF |
01/06/2011 |
0068464 PE |
RINI |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR MECHANICAL DUCTWORK AND HVAC UNITS FOR RENOVATION OF S
|
|
Work on Floor(s): 001
|
| 10/06/2010 |
420272868 |
01 |
A2 |
X SIGNED OFF |
01/05/2011 |
0021282 RA |
FISCHER |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR RENOVATION OF EXISTING OFFICE SPACE. INSTALL NEW NON-
|
|
Work on Floor(s): 001
|
| 12/02/2009 |
420110506 |
02 |
A2 |
X SIGNED OFF |
03/15/2010 |
0068464 PE |
RINI |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR MECHANICAL DUCTWORK FOR RENOVATION OF SPACE AS SHOWN O
|
|
Work on Floor(s): 001,002
|
| 12/02/2009 |
420110506 |
01 |
A2 |
X SIGNED OFF |
03/15/2010 |
0021282 RA |
FISCHER |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR RENOVATION OF EXISTING OFFICE SPACE. INSTALL NEW NON-
|
|
Work on Floor(s): 001,002
|
| 10/15/2008 |
402194745 |
07 |
A1 |
P APPROVED |
10/24/2008 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 011
|
| 08/29/2008 |
402194745 |
06 |
A1 |
P APPROVED |
09/08/2008 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 011
|
| 02/21/2008 |
402674094 |
01 |
SC |
U COMPLETED |
03/05/2008 |
0021282 RA |
FISCHER |
|
NOT APPLICABLE
|
|
CONDOMINIUM SUBDIVISION BLOCK: 414 CONDOMINIUM LOTS: 1001 & 1002 (2 COMMER
|
|
Work on Floor(s): CLE 1 thru 11
|
| 02/07/2008 |
402194745 |
05 |
A1 |
P APPROVED |
02/14/2008 |
0021283 RA |
Fischer |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 011
|
| 01/15/2008 |
402194745 |
04 |
A1 |
P APPROVED |
01/22/2008 |
0021283 RA |
Fischer |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 011
|
| 07/13/2007 |
402632004 |
01 |
A3 |
X SIGNED OFF |
04/24/2008 |
0029017 RA |
WESLOLWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF 180 FEET X 140 FEET HIGH PIPE SCAFFOLD DURING BLDG ALTERAT
|
|
Work on Floor(s): OSP
|
| 05/21/2007 |
402597604 |
01 |
A2 |
X SIGNED OFF |
11/26/2008 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
Filing herewith for Boiler installation in conjunction with alt-1 40219474
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 011
|
| 02/26/2007 |
402229940 |
02 |
A3 |
P APPROVED |
03/22/2007 |
0020419 RA |
Hulme |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLING HEAVY DUTY SIDEWALK SHED, A T OT
|
|
Work on Floor(s): 001
|
| 01/12/2007 |
402524078 |
01 |
A3 |
X SIGNED OFF |
02/13/2008 |
0079601 PE |
McERLEAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SINGLE PECCO 5000 PERSONNEL/MATERIAL HOIST 157' HIGH DUR
|
|
Work on Floor(s): 001
|
| 08/30/2006 |
402448026 |
01 |
A2 |
X SIGNED OFF |
11/14/2008 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
Filing herewith for Fire Alarm Modifications. No change in egress, use or
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 011
|
| 10/18/2005 |
402229940 |
01 |
A3 |
X SIGNED OFF |
06/24/2008 |
0020419 RA |
Hulme |
|
NOT APPLICABLE
|
|
INSTALLING HEAVY DUTY SIDEWALK SHED, A T OTAL OF 220 FT LONG BRIDGE, AT
|
|
Work on Floor(s): 001
|
| 10/05/2005 |
402217891 |
01 |
A3 |
X SIGNED OFF |
10/31/2008 |
0021282 RA |
Fischer |
|
NOT APPLICABLE
|
|
Filing herewith for Builders Pavement Plan 100' on Queens Plaza North and
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 011
|
| 09/07/2005 |
402204761 |
01 |
A2 |
X SIGNED OFF |
12/05/2008 |
0057779 PE |
Rini |
|
NOT APPLICABLE
|
|
Filing herewith for Sprinkler and Standpipe work. No change in egress, use
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 011
|
| 08/19/2005 |
402194745 |
03 |
A1 |
X SIGNED OFF |
01/26/2009 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
Filing herewith for mechanical and plumbing work
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 011
|
| 08/19/2005 |
402194745 |
02 |
A1 |
X SIGNED OFF |
01/26/2009 |
0063868 PE |
Najarian |
|
NOT APPLICABLE
|
|
Filing herewith for structural work for vertical enlargement
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 011
|
| 08/19/2005 |
402194745 |
01 |
A1 |
X SIGNED OFF |
01/26/2009 |
0021283 RA |
Fischer |
|
NOT APPLICABLE
|
|
Fiing herewith for vertical enlargement to an existing 2 story building
|
|
Work on Floor(s): CEL,ATT,ROF 001 thru 011
|
| 11/09/2004 |
402034222 |
01 |
SG |
P APPROVED |
03/24/2005 |
0068242 PE |
MAREK |
|
NOT APPLICABLE
|
|
INDIRECTLY ILLUMINATED NONADVERTISING ACCESSORY SIGN ON REAR WALL FA
|
|
Work on Floor(s): 001
|
| 09/04/2001 |
401287601 |
01 |
SG |
R PERMIT-ENTIRE |
11/09/2001 |
0038550 PE |
Mok |
|
NOT APPLICABLE
|
|
To install non-illuminated, non-advertising sign face located within 200'
|
| 09/04/2001 |
401284971 |
01 |
SG |
R PERMIT-ENTIRE |
11/09/2001 |
0038550 PE |
Mok |
|
NOT APPLICABLE
|
|
To install non-illumnated, non-advertising sign face located within 200'
|
| 09/04/2001 |
401284953 |
01 |
SG |
R PERMIT-ENTIRE |
11/09/2001 |
0038550 PE |
Mok |
|
NOT APPLICABLE
|
|
To install non-illuminated, non-advertising sign face located within 200'
|
| 08/14/2001 |
401284962 |
01 |
A2 |
R PERMIT-ENTIRE |
11/08/2001 |
0038550 PE |
Mok |
|
NOT APPLICABLE
|
|
To install wall sign structure projecting beyond property line and located
|
|